CERC · Central Electricity Regulatory Commission

Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022

Regulation · Gazette copyDated 7 Jun 2022Published in the Gazette 19 Jul 2022No. L-1/261/2021/CERC.— dated the 7th June, 2022

The Gazette copy of the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 45 of 56. Check the regulator's original before you rely on it.

The document is the Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022, issued by CERC and published in the Gazette of India (p1, p30). It creates a consolidated framework for non-discriminatory open access to the inter-State transmission system (ISTS), moving from the earlier connectivity/long-term access approach to General Network Access (GNA) and Temporary GNA (T-GNA) (p30). It applies across India to entities seeking or holding ISTS connectivity/access, and assigns procedural roles to CTU, NLDC, RLDC, SLDC, STU, power exchanges and transmission licensees (p30–45).

Chapter 1 defines the core vocabulary — Connectivity, GNA, T-GNA, ATS, Lead Generator, Lead ESS, ESS, REGS, NOAR and Nodal Agency — and says the regulations commence on a date CERC notifies, with different dates possible for different provisions (p30–32). Chapter 2 specifies application routes, fees, deficiency handling, withdrawal forfeitures and priority among connectivity applications (p32–33).

Chapter 3 (p33–38) sets eligibility thresholds for Connectivity; application contents; CTU interconnection study and ATS identification; in-principle and final grants; the three-part Connectivity Bank Guarantee (Conn-BG1, Conn-BG2 by terminal-bay voltage, Conn-BG3 by MW); the Connectivity Agreement; monitoring; construction and ownership of dedicated lines and terminal bays; interface meters; transfer/splitting of connectivity; and return or encashment of bank guarantees.

Chapter 4 (p38–41) covers GNA eligibility, deemed GNA for STUs and other grid-connected entities based on historical drawal (Annexure-I, p28–29), additional GNA applications by STU and non-STU entities, system study, grant timelines, effective dates, and use of one grantee’s GNA by another. Chapter 5 (p41–42) provides for relinquishment of Connectivity and GNA, including charges. Chapter 6 (p42–45) establishes T-GNA, the National Open Access Registry (NOAR), application categories (advance/exigency for bilateral, power exchange for collective), and processing/priority rules. References in the text show later provisions on standing clearance, scheduling and detailed procedures (Regs 31, 33, 37, 39).

Standard name
Connectivity and GNA Regulations, Open Access Regulations
Primary topics
Connectivity and GNA, Open access, Open access charges

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (4)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.