Draft Business Plan Regulations, 2023 — Explanatory Memorandum

EXPLANATORY MEMORANDUM DRAFT DELHI ELECTRICITY REGULATORY COMMISSION (BUSINESS PLAN) REGULATIONS, 2023

Explanatory memorandum to a draftDated 13 Jan 2023

Draft

The draft has since been finalised as the Business Plan Regulations, 2023.

Explanatory memorandum to the Business Plan Regulations, 2023 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

DERC's Explanatory Memorandum accompanies the draft DERC (Business Plan) Regulations, 2023 (p1). It is not the operative regulation itself: it reproduces the draft clauses and explains the Commission's rationale, with public comments invited until 14/02/2023 (p1). The draft is proposed in succession to the DERC (Business Plan) Regulations, 2019 (p1).

Part A introduces the statutory basis, the upload of the draft, the consultation process and the purpose of the memorandum (p1). Part B covers common tariff inputs. Section 1 explains the proposed return on equity for generating entities, transmission licensees and distribution licensees, using CAPM, listed peer utilities, BSE Sensex returns and G-Sec yields; Annexure A at pp13–15 supplies the daily G-Sec data used for the risk-free rate (p1–12). Section 2 explains the margin over SBI MCLR allowed for interest on loan, including annual caps and a transparent loan-procurement requirement (p31–34). Section 3 sets out the methodology for the inflationary growth rate using weighted WPI and CPI (p34–35). Section 4 explains the efficiency factor with reference to APTEL (p35–36).

Part C, on generating entities, covers normative O&M expenses for GTPS and PPS-I, capital investment, plant availability and load factors, gross station heat rate and auxiliary energy consumption, with comparisons to CERC norms and historical performance (p36–48). Part D, on the transmission licensee, covers O&M expenses, capital investment, the transmission availability norm and the monthly transmission charge incentive formula (p48–53). Part E, on distribution licensees, covers O&M norms, treatment of uncontrollable employee and statutory-levy costs, capitalisation and smart metering, distribution loss targets with division-wise loss-zone methodology and sharing, collection efficiency, and renewable purchase obligation targets including HPO, REC/HEC compliance and penalties (p53–75). The memorandum matters as the reasoning document for the next control-period business plan norms for Delhi's regulated utilities, while the draft proposals are not stated as being in force.

Primary topics
Multi Year Tariff (MYT), Return, financing and working capital, Operating costs and other income

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document