EXPLANATORY MEMORANDUM DRAFT DELHI ELECTRICITY REGULATORY COMMISSION (BUSINESS PLAN) REGULATIONS, 2023
Explanatory memorandum to a draftDated 13 Jan 2023
Draft
The draft has since been finalised as the Business Plan Regulations, 2023.
Explanatory memorandum to the Business Plan Regulations, 2023 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
DERC's Explanatory Memorandum accompanies the draft DERC (Business Plan) Regulations, 2023 (p1). It is not the operative regulation itself: it reproduces the draft clauses and explains the Commission's rationale, with public comments invited until 14/02/2023 (p1). The draft is proposed in succession to the DERC (Business Plan) Regulations, 2019 (p1).
Part A introduces the statutory basis, the upload of the draft, the consultation process and the purpose of the memorandum (p1). Part B covers common tariff inputs. Section 1 explains the proposed return on equity for generating entities, transmission licensees and distribution licensees, using CAPM, listed peer utilities, BSE Sensex returns and G-Sec yields; Annexure A at pp13–15 supplies the daily G-Sec data used for the risk-free rate (p1–12). Section 2 explains the margin over SBI MCLR allowed for interest on loan, including annual caps and a transparent loan-procurement requirement (p31–34). Section 3 sets out the methodology for the inflationary growth rate using weighted WPI and CPI (p34–35). Section 4 explains the efficiency factor with reference to APTEL (p35–36).
Part C, on generating entities, covers normative O&M expenses for GTPS and PPS-I, capital investment, plant availability and load factors, gross station heat rate and auxiliary energy consumption, with comparisons to CERC norms and historical performance (p36–48). Part D, on the transmission licensee, covers O&M expenses, capital investment, the transmission availability norm and the monthly transmission charge incentive formula (p48–53). Part E, on distribution licensees, covers O&M norms, treatment of uncontrollable employee and statutory-levy costs, capitalisation and smart metering, distribution loss targets with division-wise loss-zone methodology and sharing, collection efficiency, and renewable purchase obligation targets including HPO, REC/HEC compliance and penalties (p53–75). The memorandum matters as the reasoning document for the next control-period business plan norms for Delhi's regulated utilities, while the draft proposals are not stated as being in force.
Read with this
The regulation
- Dated 29 Mar 2023Business Plan Regulations, 2023
Amendments and corrections
- Dated 3 Oct 2023Statement of Reasons for Business Plan Regulations 2023 — Errata
- Dated 30 Apr 2026Business Plan Regulations, 2023 — First Amendment, 2026
Commencement notices and reasons
- Dated 24 Apr 2023Business Plan Regulations, 2023 — Statement of Reasons
Earlier drafts
- Dated 13 Jan 2023Business Plan Regulations, 2023 — Draft
- Dated 13 Jan 2023Comments received: Public Notice Inviting Comments on Draft Business Plan, Tariff and REC-RPO Regulations, 2023
- Dated 1 Feb 2023Draft Business Plan Regulations 2023 — Explanatory Memorandum — Additional Information
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.