DERC · Delhi Electricity Regulatory Commission

Business Plan Regulations, 2023 — Draft

Delhi Electricity Regulatory Commission (Business Plan) Regulations, 2023

Draft regulationDated 13 Jan 2023F.3(679)/Tariff/DERC/2022-23/7460

Draft

A proposal that has since been finalised as the Business Plan Regulations, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is the Delhi Electricity Regulatory Commission's draft Business Plan Regulations, 2023, issued under s.181 read with s.61 and s.86(1)(b) of the Electricity Act, 2003 (p2). It sets the business-plan parameters DERC will use for the 2023-26 control period — FY 2023-24, FY 2024-25 and FY 2025-26 — unless reviewed earlier, with power to extend the validity and operational norms (p2). It extends to the whole of the National Capital Territory of Delhi (p2).

Part 1 (pp2–3) gives the short title, control period and extent, and adopts definitions from the DERC Tariff Regulations, 2017 and the Electricity Act, 2003. Part 2 (pp3–7) covers generating entities: base return on equity and tax gross-up, the margin over SBI MCLR for interest on loan, normative O&M expenses, a tentative capital-investment plan, operating norms for availability/PLF, heat rate and auxiliary consumption, a generation incentive above normative PLF, a net-gain sharing mechanism for heat-rate and auxiliary-consumption performance, and sharing of refinancing gains.

Part 3 (pp8–11) does the same for the transmission licensee: return on equity, tax gross-up, interest margin, normative O&M, capital investment, normative annual transmission availability, the monthly transmission-charge formula linked to availability bands, and refinancing-sharing. Part 4 (pp12–24) is the largest part and covers distribution licensees: return on equity, tax, interest margin, O&M norms by licensee, capitalisation plans including smart metering, distribution-loss targets, collection-efficiency target, renewable and hydro purchase obligations with compliance and penalty provisions, a contingency limit for deviation-settlement sales, incentive sharing for surplus-power sales, the power-purchase cost adjustment recovery mechanism, allocation of ARR between wheeling and retail supply, revenue-gap treatment and ToD time slots. Part 5 (p25) contains miscellaneous powers — practice directions, removal of difficulties, relaxation, interpretation, inherent powers, enquiry procedure and amendment. Appendices I–III (pp26–29) prescribe the transmission availability calculation, SIL values and related formulae.

Primary topics
Multi Year Tariff (MYT), Capital cost and investment, Return, financing and working capital

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document