Explanatory memorandum to a draftDated 1 Feb 2023

Draft

The draft has since been finalised as the Business Plan Regulations, 2023.

Explanatory memorandum to a draft that is not on Voltaic.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This document is additional information published by DERC to supplement the explanatory memorandum on the Draft Business Plan Regulations 2023, which the Commission published on 13.01.2023 (p1). It does not itself propose or amend a regulation; it explains how the Commission computed the normative O&M expenses for Delhi's distribution licensees over the Business Plan Control period.

Paragraphs A–G on p1 set out the methodology. The base-year cost for FY 2022-23 is the lower of two computations: the average cost of the last five years escalated by the inflation rate for three years, or the last audited year's cost escalated by the inflation rate (p1). The document then lists the controllable O&M categories — Non-FRSR employee cost, A&G, R&M and other business expenses — for BRPL, BYPL and TPDDL (p1). The base-year controllable O&M cost is escalated annually by an inflation factor and an efficiency factor to produce normative O&M expenses for FY 2023-24 to FY 2025-26, and divided by estimated sales to arrive at cost per unit (p1).

Sales are projected using CAGR growth from FY 2017-18 to FY 2019-20, with FY 2020-21 and FY 2021-22 excluded because of the Covid-19 lockdown, and a further uniform growth assumption applied to the DISCOMs' estimated sales (p1). The document provides the resulting estimated sales for each DISCOM (p1). For NDMC, the cost per unit is set equal to BYPL's (p1).

The detailed build-up follows in tables: BRPL's audited and estimated O&M expense lines on p2, BYPL's on p3, and TPDDL's on p4. Page 5 supplies the WPI and CPI index data, average changes and the blended inflation growth rate used in the computation. The document is therefore a methodology and data annexure to the draft business plan consultation, useful for seeing how the Commission derived the O&M cost numbers rather than as an operative tariff or business-plan instrument.

Primary topics
Operating costs and other income

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Earlier drafts

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.