WBERC · West Bengal Electricity Regulatory Commission
Recovery of Expenditure for Providing New Connections, 2013 — First Amendment, 2020 — Draft
West Bengal Electricity Regulatory Commission (Recovery of Expenditure for Providing New Connections) (First Amendment) Regulations, 2020
Draft amendmentDated 24 Jan 2020WBERC/Regulation-61/19-20/5341 dated 24th January, 2020
Draft
A proposal that has since been finalised as the Recovery of Expenditure for Providing New Connections Regulations, 2013 — First Amendment, 2020.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a two-part WBERC consultation document. Page 1 is a notice dated 24 January 2020 drawing attention to two draft instruments — the draft WBERC (Standards of Performance of Licensees Relating to Consumer Services) (Fourth Amendment) Regulations, 2020 and the draft WBERC (Recovery of Expenditure for Providing New Connections) (First Amendment) Regulations, 2020 — and inviting suggestions, objections and comments on either or both. Comments must reach the Commission by 10.02.2020 (upto 5 P.M.), with further details on the Commission's website (p1).
Page 2 carries the text of the second draft only. It recites that it is made under s.181(1) and s.181(2)(zp) read with s.46 of the Electricity Act, 2003, and that it amends the WBERC (Recovery of Expenditure for Providing New Connection) Regulations, 2013, published under notification no. 53/WBERC dated 2 April 2013, referred to as the "Principal Regulation" (p2). Clause 1 gives the short title, extends the regulation to the whole of West Bengal, and provides that it comes into force on publication in the Official Gazette. Clause 2 inserts a new regulation 4.4 into the Principal Regulation, requiring the distribution licensee to fix the rate of service connection in Rs/kVA for applications of at least upto 150 kVA of contract demand, and to frame a procedure for the purpose under regulation 13.13 of the Standards of Performance Regulations (p2).
The draft is at consultation stage: the draft notification number and date are left blank, and the text closes with the Secretary's signature block (p1–2).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
Earlier drafts
Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.