Recovery of Expenditure for Providing New Connections, 2013 — First Amendment, 2020 — Draft

West Bengal Electricity Regulatory Commission (Recovery of Expenditure for Providing New Connections) (First Amendment) Regulations, 2020

Draft amendmentDated 24 Jan 2020WBERC/Regulation-61/19-20/5341 dated 24th January, 2020

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-part WBERC consultation document. Page 1 is a notice dated 24 January 2020 drawing attention to two draft instruments — the draft WBERC (Standards of Performance of Licensees Relating to Consumer Services) (Fourth Amendment) Regulations, 2020 and the draft WBERC (Recovery of Expenditure for Providing New Connections) (First Amendment) Regulations, 2020 — and inviting suggestions, objections and comments on either or both. Comments must reach the Commission by 10.02.2020 (upto 5 P.M.), with further details on the Commission's website (p1).

Page 2 carries the text of the second draft only. It recites that it is made under s.181(1) and s.181(2)(zp) read with s.46 of the Electricity Act, 2003, and that it amends the WBERC (Recovery of Expenditure for Providing New Connection) Regulations, 2013, published under notification no. 53/WBERC dated 2 April 2013, referred to as the "Principal Regulation" (p2). Clause 1 gives the short title, extends the regulation to the whole of West Bengal, and provides that it comes into force on publication in the Official Gazette. Clause 2 inserts a new regulation 4.4 into the Principal Regulation, requiring the distribution licensee to fix the rate of service connection in Rs/kVA for applications of at least upto 150 kVA of contract demand, and to frame a procedure for the purpose under regulation 13.13 of the Standards of Performance Regulations (p2).

The draft is at consultation stage: the draft notification number and date are left blank, and the text closes with the Secretary's signature block (p1–2).

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
Connection and miscellaneous charges

Read with this

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document