WBERC · West Bengal Electricity Regulatory Commission
Recovery of Expenditure for Providing New Connections Regulations, 2013 — First Amendment, 2020
West Bengal Electricity Regulatory Commission (Recovery of Expenditure for Providing New Connections) (First Amendment) Regulations, 2020
AmendmentDated 25 Feb 2020Published in the Gazette 26 Feb 202067/WBERC dated 25th February, 2020
Amends the Recovery of Expenditure for Providing New Connections Regulations, 2013.
Summary
Summary written by software. Check the regulator's original before you rely on it.
A single-page notification (p1) by the West Bengal Electricity Regulatory Commission, dated 25 February 2020 and carried in the Kolkata Gazette of 26 February 2020. It amends the Commission's 2013 regulations on recovery of expenditure for providing new connections by inserting a new regulation 4.4 after regulation 4.3.
The inserted regulation requires the distribution licensee to fix the rate of service connection in Rs/kVA or Rs/kW rather than on a per-connection basis, and to make that rate application at least upto 150 kVA of contract demand. Licensees must frame the procedure for this through regulation 13.13 of the Standards of Performance Regulations (p1).
Clause 1 gives the short title, extends the amendment to the whole of West Bengal, and brings it into force on gazette publication. Nothing else in the 2013 principal regulations is altered.
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.