Skip to content

WBERC · West Bengal Electricity Regulatory Commission

Recovery of Expenditure for Providing New Connections Regulations, 2013

West Bengal Electricity Regulatory Commission (Recovery of Expenditure for Providing New Connections) Regulations, 2013

RegulationDated 2 Apr 2013Published in the Gazette 2 Apr 2013No. 53/WBERC dated 2nd April, 2013

2 amendments to it are on Voltaic, the latest dated 15 Sep 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

Notification No. 53/WBERC, dated 2 April 2013 and published in the Kolkata Gazette Extraordinary of the same date (p1), makes the WBERC (Recovery of Expenditure for Providing New Connections) Regulations, 2013 — the instrument that decides who pays what when a new electricity connection is given in West Bengal. It replaces the 2005 regulations on the same subject, with a savings clause preserving action already taken (p1, p7).

Regulations 1–2 (p1–2) give the short title, commence on gazette publication, apply the Bengal General Clauses Act, 1899 and define the working terms — the LT/MT/HT/EHT voltage tiers are simply adopted from the Standards of Performance Regulations, and the 'Schedule of Rates' is defined as a licensee-prepared, index-based rate schedule.

Regulations 3–4 (p2–3) place the duty to plan, extend and execute the works on the distribution licensee, then set the cost-sharing rules: where mains already exist the licensee bears the service line up to a fixed length and recovers the excess from the applicant; where mains must be extended, the cost of the common extended facilities is shared among new consumers in proportion to connected loads, with later consumers contributing until the licensee's outlay is fully recouped and refunds owed to consumers who built assets under a turnkey procedure. Apartment blocks, housing societies and similar complexes have a separate recovery route.

Regulations 5–7 (p3–4) cover meter cost as an applicant option, the licensee bearing residual cost with adjustment of estimates against actuals, and a graded refund/forfeiture ladder (with different deduction percentages and rupee caps for LT, HT and EHT) when an applicant withdraws, plus a two-year window for re-use of the installation before full forfeiture.

Regulations 8–10 (p4) require work to start within a fixed period after payment, route estimate and delay disputes to the 2006 Ombudsman regulations, and levy charges for estimate revisions made at the consumer's instance.

Regulation 11 (p5) governs the Cost Schedule — annual indexation, periodic fresh schedules, a supervision-charge loading, and mandatory website and notice-board publication. Regulations 12–18 (p5–6) keep consumers' contributions out of the capital base, vest asset ownership in the licensee, penalise load-splitting, require intelligible estimates and bar recovery where ARR or government schemes already fund the work, fix the payment window, and require space for distribution transformers and block meters in congested premises.

Regulations 20–21 (p7) give the Commission difficulty-removal and inherent powers and repeal the 2005 regulations.

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
Connection and miscellaneous charges, New connections and load changes, Supply to buildings and colonies

Read with this

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of WBERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.