HPERC · Himachal Pradesh Electricity Regulatory Commission

Conduct of Business (Eighth Amendment) Regulations, 2014

Himachal Pradesh Electricity Regulatory Commission (Conduct of Business) (Eighth Amendment) Regulations, 2014

AmendmentDated 2 Jun 2014No. HPERC/Secy/151 dated the 2 nd June, 2014

Replaced by Conduct of Business Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Conduct of Business Regulations, 2005.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal anything done or any action taken or purported to have been done or taken including any order or notice or notification made or issued or any instrument executed or direction given under the regulations so repealed shall be valid and shall be deemed to have been done or taken under the corresponding provisions of these Regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short notification from the Himachal Pradesh Electricity Regulatory Commission, dated Shimla 2 June 2014, making the Eighth Amendment to the HPERC (Conduct of Business) Regulations, 2005 (p1). Its entire substance is a revision of the fee Schedule annexed to those regulations — the charges applicants pay the Commission for processing tariff and related applications.

Regulation 1 gives the short title and provides that the amendment takes effect from publication in the Rajpatra, Himachal Pradesh; the Gazette date is not printed (p1). Regulation 2 then amends the Schedule in four moves. Under '(a) Hydel Projects' a new item is inserted for applications for subsequent determination of Annual Fixed Cost under each M.Y.T., including periodic review and true up, charged at 10% of the fee already payable for tariff determination, with a note that composite applications attract only one fee (p1). The single existing entry under '(b) Renewable energy generation projects' is renumbered and a parallel item is added for Annual Fixed Cost, performance review, periodic review including true up, at 5% of the tariff-determination fee, on the same composite-application note (p1).

The substituted entries in column (4) against serial nos. 5-B and 6 replace flat fees with capacity-banded amounts: up to 2 MW, above 2 MW up to 5 MW, and above 5 MW for 5-B (₹10,000 / ₹20,000 / ₹50,000, pp1–2), and up to 2 MW, above 2 MW and above 5 MW for serial no. 6 (Nil / ₹10,000 / ₹25,000, p2). Finally, the entry against serial no. 7 is capped: after the words 'tariff determination', 'subject to maximum of Rs. 50,000' is inserted (p2). The notification closes with the Secretary's order line and does not restate the Schedule it amends.

Standard name
Conduct of Business Regulations
Primary topics
Fees payable to the Commission

Read with this

The regulation

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document