Conduct of Business Regulations, 2005 — Thirteenth Amendment, 2023

Himachal Pradesh Electricity Regulatory Commission (Conduct of Business) (Thirteenth Amendment) Regulations, 2023

AmendmentDated 31 Mar 2023No. HPERC/151/Vol-III dated 31st March, 2023

Replaced by Conduct of Business Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Conduct of Business Regulations, 2005.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal anything done or any action taken or purported to have been done or taken including any order or notice or notification made or issued or any instrument executed or direction given under the regulations so repealed shall be valid and shall be deemed to have been done or taken under the corresponding provisions of these Regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

HPERC's thirteenth amendment to its Conduct of Business Regulations, 2005, notified from Shimla on 31 March 2023 (p1). It is a single-purpose fee revision: everything substantive sits in Regulation 2, which substitutes figures in column 4 — the fee column — of the 'Fee Structure' Schedule annexed to the 2005 Regulations (p1–3).

The notification opens by citing its powers under clauses (g), (zg) and (zl) of s.181(2), s.86(1)(g) and s.92(1) of the Electricity Act 2003 read with s.21 of the General Clauses Act 1897, records that it follows previous publication, and states that the amendments take effect from publication in the Rajpatra, Himachal Pradesh (p1). Regulation 1 gives the short title and that commencement rule; the Gazette date itself is not printed.

Regulation 2 then works through the Schedule head by head, serial 1 through 14, then 13A and 17. Most heads are straightforward increases — for example serial 1 moves from '1 lakh' to '3 lakh', and the percentage fee at serial 2(ii) from '0.035 %' to '0.045%' (p1) — while serial 3 is rewritten more substantially: item (a)(i) becomes '50 lakh plus 50,000/- for every additional 1.00MW or part thereof in excess of 25MW, subject to a maximum 150 lakh under this item', and item (b)(i) becomes '60,000/- per 100kW or part thereof subject to a maximum of 10 lakh' (p1–2). Heads 4 to 14 follow the same pattern of revised lump sums, with a per-MW head among them (p2–3). Serials 15 and 16 are left untouched.

Nothing else changes: no procedural provision, definition, form or timeline is touched, and there is no repeal, savings or transitional clause. The document closes with 'By order of the Commission' and the Secretary's signature (p3).

Standard name
Conduct of Business Regulations
Primary topics
Fees payable to the Commission

Read with this

The regulation

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.