Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Conduct of Business (Thirteenth Amendment) Regulations, 2023 — Draft

Himachal Pradesh Electricity Regulatory Commission (Conduct of Business) (Thirteenth Amendment) Regulations, 2023

Draft amendmentDated 28 Feb 2023No. HPERC/151/Vol-III.- dated 28th February, 2023

Draft

A proposal that has since been finalised as the Conduct of Business Regulations, 2005 — Thirteenth Amendment, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

On 28 February 2023 the Himachal Pradesh Electricity Regulatory Commission published a notice of a draft amendment to its own Conduct of Business Regulations, 2005 (p1). It is a pre-notification consultation: the Commission states the draft will be taken into consideration after twenty-one days from its publication in the Rajpatra, Himachal Pradesh, and invites objections and suggestions to the Secretary within that period (p1). It points readers to the original Regulations and to an Explanatory Memorandum on its website (p1).

The operative text is short and purely financial. Clause 1 names the instrument and ties commencement to publication in the Rajpatra (p1). Clause 2 amends the Schedule to the 2005 Regulations, titled "Fee Structure", by substituting figures in column 4 across serial Nos. 1 to 17 (p1–3). Most sub-clauses raise an existing fee head. A few do more than raise a number: against serial No. 3 the draft introduces a slab formula (a base amount plus a per-MW charge for capacity above a threshold, capped by a maximum) and a per-100 kW rate capped by a maximum (p2). Others revise ad valorem percentage fees, per-petition charges and per-MW rates (p1–3).

Because the draft works only by substitution — "for X, Y shall be substituted" — it does not reproduce the Schedule it amends, and the fee heads behind each serial number are not visible from this document alone (p1–3). The Explanatory Memorandum is referenced but not attached (p1).

Standard name
Conduct of Business Regulations
Primary topics
Fees payable to the Commission

Read with this

The regulation

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document