HPERC · Himachal Pradesh Electricity Regulatory Commission

Wheeling Tariff and Retail Supply Tariff (Third Amendment) Regulations, 2018 — Draft

Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Wheeling Tariff and Retail Supply Tariff) (Third Amendment) Regulations, 2018

Draft amendmentDated 8 Oct 2018No. HPERC-F(1)-1/2018 dated 08th October, 2018

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is HPERC's notification of 8 October 2018 publishing, for public objection, a draft set of amendments to its 2011 regulation governing wheeling and retail supply tariff determination (p1). The preamble explains why: alignment with the National Tariff Policy 2016 and central Commission methodologies, consistency with HPERC's 2015 terminal-benefits regulations and 2014 regulatory-accounting regulations, a shift of working-capital interest away from base rate towards MCLR, removal of gaps and discrepancies, and preparation for tariff determination for the control period beginning 1 April 2019 (p1). Objections must reach the Secretary within 21 days of publication in the Rajpatra; the text is on the Commission's website; the draft regulations would come into force on Rajpatra publication (pp1–2).

The draft has 20 amendment regulations. The first two give the short title, commencement and a set of definition changes — accounting statements, change in law, consumer, force majeure event, MCLR, prudence check, and a residual-interpretation clause (pp2–4).

The middle block rewrites the tariff-building machinery: uncontrollable parameters for a distribution licensee (p4–5), a new obligation to prepare accounting manuals and regulatory accounts and file regulatory audited accounts annually (p5), substituted targets for controllable parameters with a mid-term review mechanism (pp5–6), quarterly capital-expenditure reporting (p6), carrying cost on true-ups (p6), disclosure of terminal-benefit sharing (p6), a substituted asset-base determination rule including treatment of retired assets and insurance proceeds (pp6–7), a new regulation on consumer contribution, deposit works, grants and capital subsidy (pp7–8), interest on notional loan and foreign-exchange hedging (p8).

The final block covers depreciation of IT assets, a substituted non-tariff income regulation (pp9–10), separate accounts for other business (p10), working capital for wheeling and retail supply business (pp10–11), a new bad-and-doubtful-debt provision (p11), detailed sales-forecast and power-procurement-plan requirements including renewable/co-generation purchase (pp11–13), and refund of excess charges with interest (p13).

Standard name
Wheeling and Retail Supply Tariff Regulations
Primary topics
Wheeling and retail supply tariff, Tariff determination, Multi Year Tariff (MYT)

Read with this

The regulation

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document