HPERC · Himachal Pradesh Electricity Regulatory Commission

Wheeling and Retail Supply Tariff Regulations, 2011 — Fourth Amendment, 2020 — Draft

Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Wheeling Tariff and Retail Supply Tariff) (Fourth Amendment) Regulations, 2020

Draft amendmentDated 10 Nov 2020No.HPERC-F(1)-1/2020 dated 10th November, 2020

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft amendment notification issued by the Himachal Pradesh Electricity Regulatory Commission at Shimla on 10 November 2020 (p1). It publishes, for objections and suggestions, proposed changes to the HPERC (Terms and Conditions for Determination of Wheeling Tariff and Retail Supply Tariff) Regulations, 2011 — the Commission's principal instrument for tariff determination for the distribution licensee, HPSEBL.

The preamble sets out why the review is being made: the 2011 regulations need to be aligned with the National Tariff Policy, 2016 and with changes in the Central Commission's methodologies, and certain gaps and discrepancies need to be addressed. The Commission notes it is preparing to determine tariff for the second Annual Performance Review of the fourth control period beginning 1 April 2021 (p1).

The draft itself carries two operative clauses (p2). Clause 2 substitutes regulation 22, restating how interest on working capital is computed: on a normative basis at the one-year SBI MCLR (or its replacement as notified by RBI) applicable as on 1 April of the financial year in which the petition is filed, plus 300 basis points, payable whether or not the licensee has actually taken a working capital loan or has exceeded the normative amount, with the Commission calculating the working capital requirement for wheeling and retail supply business under the regulations.

Clause 3 adds a new entry, Sr. No. (P), to the Depreciation Schedule table in Appendix 1, with notes providing that where an asset's useful life is shorter than that prescribed the useful life under the Companies Act, 2013 applies, and that IT equipment including software may be depreciated up to 100% with the seventh-year rate set accordingly (p2).

Clause 1 gives the short title and provides that the regulations come into force from the date of publication in the Rajpatra, Himachal Pradesh. Objections or suggestions, specifically relating to the draft, are to reach the Secretary, HPERC within 21 days of that publication (pp1–2).

Standard name
Wheeling and Retail Supply Tariff Regulations
Primary topics
Return, financing and working capital

Read with this

The regulation

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗