Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Wheeling and Retail Supply Tariff Regulations, 2011

Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Wheeling Tariff and Retail Supply Tariff) Regulations, 2011

RegulationDated 1 Apr 2011In force from 1 Apr 2011No. HPERC/Dis/479.- dated 1st April 2011

Replaced by Multi Year Wheeling Tariff & Retail Supply Tariff Regulations, 2023

See that regulation for the date it took effect and for anything it keeps in force.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, any proceedings before the Commission pertaining to the period prior to the commencement of the Control Period, including Petitions for True up of expenses, annual performance review, etc.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Himachal Pradesh Electricity Regulatory Commission's notification dated 1 April 2011, making the 2011 regulations for determining wheeling and retail supply tariffs for distribution licensees (p1). The regulations are made under the Electricity Act 2003 and apply to the whole State of Himachal Pradesh; they come into force on 1 April 2011, the same date as the control period beginning then (pp1–2). The preamble records that changes in the National Tariff Policy and Central Commission methodologies made it necessary to replace the 2007 regulations, which reg 50 then repeals with savings (p1, p28).

Part I contains preliminary matters and definitions (pp2–4). Part II lays down guiding principles: a multi-year tariff framework with business plans, licensee forecasts, performance targets, annual review, profit sharing, true-up and a contingency reserve; segregation of wheeling and retail supply accounts; baseline determination; sales forecasting; capital investment approval; quality-of-supply monitoring; and true-up treatment of controllable and uncontrollable variations (pp4–10).

Part III sets the principles for determining the aggregate revenue requirement (ARR) for the distribution business and separately for wheeling and retail supply businesses (pp10–21). It covers cost of power procurement and merit-order scheduling, distribution loss trajectories, transmission and load despatch charges, O&M expenses, asset base, debt-equity treatment, return on equity, interest and finance charges, working capital, depreciation, income tax, non-tariff income, other-business income, cross-subsidy and additional surcharge receipts, and quality of supply and services (pp10–21).

Part IV sets the multi-year tariff filing procedure, including business plan filings, annual performance review, tariff filing contents, public disclosure, disposal of applications and publication (pp21–26). Part V deals with subsidy from the State Government and how it is reflected in tariffs and consumer bills (pp26–27). Part VI contains transitory provisions, powers to issue orders and practice directions, removal of difficulties, relaxation, interpretation, inherent powers, enquiry and investigation, and repeal and savings (pp27–28). The Appendix contains the depreciation schedule by asset class (pp29–30).

Standard name
Multi Year Tariff Regulations, Wheeling and Retail Supply Tariff Regulations
Primary topics
Wheeling and retail supply tariff, Tariff determination, Multi Year Tariff (MYT)

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document