MPERC · Madhya Pradesh Electricity Regulatory Commission
Madhya Pradesh Electricity Grid Code (Revision-III), 2024 — First Amendment, 2024
The Madhya Pradesh Electricity Grid Code (Revision-III) (First Amendment), 2024
Amendment · Gazette copyDated 19 Jun 2026No. MPERC / 2026 / 1024 dated 19th June 2026
The Gazette copy of the Madhya Pradesh Electricity Grid Code (Revision-III), 2024 — First Amendment.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the first amendment to the Madhya Pradesh Electricity Grid Code (Revision-III), 2024, issued by MPERC under s.86(1)(h) of the Electricity Act, 2003 as No. MPERC/2026/1024 dated 19 June 2026 (p1). It comes into force on publication in the MP Official Gazette; the Gazette date is not printed (p1). The instrument is a clause-by-clause amendment of the principal Grid Code, so its value lies in the specific regulations it rewrites.
Clause 2 reworks Regulation 7 on infirm power injection and trial runs (p1–3). It splits the permissible infirm-power injection window by plant type — conventional stations versus REGS/ESS, with Hydro PSP ESS carved out — and provides a two-tier extension route: short extensions by SLDC/RLDC on advance application, longer ones by the Commission (p1–2). It relaxes the trial-run demonstration requirement from a continuous block to a cumulative daily basis (p2), allows COD declaration for hydro units that cannot demonstrate design capability at rated water drawing levels because of reservoir conditions, with follow-up obligations and a de-rating fallback (p2), and restates when scheduling begins after COD is declared (p3).
Clause 3 amends Regulation 9 (p3–6). It adds a proviso letting Section 62 generators sell un-requisitioned surplus power in the day-ahead market without beneficiary consent, with gains shared per the PPA (p3); changes the time-block from which schedule revisions take effect (p3–4); inserts a new clause capping declared-capacity and schedule revisions per day and per month, differentiated between conventional/ESS entities and hydro, and limited to bilateral transactions (p3–4); and links Regulation 9.8 to the Commission-approved detailed operating procedure for backing down of thermal units (p4). It substitutes the compensation tables for heat-rate degradation and auxiliary energy consumption by loading band, and the start-up secondary fuel oil norms by unit size and start type (p4–5), then adds provisions on extra oil for low-load and supercritical units, a sharing formula for gains after compensation, treatment of ancillary-services schedule changes, and a procedure to be prepared by SLDC for approval (p5–6).
Clause 4 amends Regulation 17, requiring intra-state entities on the STU network and Discom-embedded entities/inter-Discom interfaces to provide Automatic Meter Reading for ABT meter data, with a fallback for manual download and certified energy data (p6–7). Clause 5 substitutes Appendix-K clauses on reactive power compensation, deferring VArh charges to separate Commission orders and imposing capability and loss-treatment obligations on Inverter Based Resources (p7).
Read with this
The regulation
- Dated 13 Mar 2024Madhya Pradesh Electricity Grid Code (Revision-III), 2024
Amendments and corrections
Procedures and orders made under it
2 more documents belong here and are not on Voltaic: 2 copies in another language.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.