MPERC · Madhya Pradesh Electricity Regulatory Commission

Madhya Pradesh Electricity Grid Code (Revision-III), 2024 — First Amendment, 2024

The Madhya Pradesh Electricity Grid Code (Revision-III) (First Amendment), 2024

Amendment · Gazette copyDated 19 Jun 2026No. MPERC / 2026 / 1024 dated 19th June 2026

The Gazette copy of the Madhya Pradesh Electricity Grid Code (Revision-III), 2024 — First Amendment.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the first amendment to the Madhya Pradesh Electricity Grid Code (Revision-III), 2024, issued by MPERC under s.86(1)(h) of the Electricity Act, 2003 as No. MPERC/2026/1024 dated 19 June 2026 (p1). It comes into force on publication in the MP Official Gazette; the Gazette date is not printed (p1). The instrument is a clause-by-clause amendment of the principal Grid Code, so its value lies in the specific regulations it rewrites.

Clause 2 reworks Regulation 7 on infirm power injection and trial runs (p1–3). It splits the permissible infirm-power injection window by plant type — conventional stations versus REGS/ESS, with Hydro PSP ESS carved out — and provides a two-tier extension route: short extensions by SLDC/RLDC on advance application, longer ones by the Commission (p1–2). It relaxes the trial-run demonstration requirement from a continuous block to a cumulative daily basis (p2), allows COD declaration for hydro units that cannot demonstrate design capability at rated water drawing levels because of reservoir conditions, with follow-up obligations and a de-rating fallback (p2), and restates when scheduling begins after COD is declared (p3).

Clause 3 amends Regulation 9 (p3–6). It adds a proviso letting Section 62 generators sell un-requisitioned surplus power in the day-ahead market without beneficiary consent, with gains shared per the PPA (p3); changes the time-block from which schedule revisions take effect (p3–4); inserts a new clause capping declared-capacity and schedule revisions per day and per month, differentiated between conventional/ESS entities and hydro, and limited to bilateral transactions (p3–4); and links Regulation 9.8 to the Commission-approved detailed operating procedure for backing down of thermal units (p4). It substitutes the compensation tables for heat-rate degradation and auxiliary energy consumption by loading band, and the start-up secondary fuel oil norms by unit size and start type (p4–5), then adds provisions on extra oil for low-load and supercritical units, a sharing formula for gains after compensation, treatment of ancillary-services schedule changes, and a procedure to be prepared by SLDC for approval (p5–6).

Clause 4 amends Regulation 17, requiring intra-state entities on the STU network and Discom-embedded entities/inter-Discom interfaces to provide Automatic Meter Reading for ABT meter data, with a fallback for manual download and certified energy data (p6–7). Clause 5 substitutes Appendix-K clauses on reactive power compensation, deferring VArh charges to separate Commission orders and imposing capability and loss-treatment obligations on Inverter Based Resources (p7).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Operating costs and other income

Read with this

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document