Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Tripura Electricity Regulatory Commission's third amendment to its 2011 Electricity Supply Code. The preamble (p1) records that the Principal Code was notified on 17 October 2011 and previously amended on 6 August 2013 and 10 January 2014, and that the changes respond to Ministry of Power 'Ease of Living' directives for consumers as well as requests from TSECL and TREDA. The regulations commence on Gazette publication (p1).
Clause 2 rewrites the schedule of supply voltages by contracted-load band across low, high and extra-high tension (pp1–2). Clause 3 adds a proviso on service connection charges and security deposits, fixing how charges are determined and paid for electrified areas up to 150 kW and requiring them to be available online (p2). Clause 4 exempts applicants with sanctioned load up to 150 kW from pre-connection field inspection (p2). Clauses 5 and 7 revise the working-day timelines for issuing the demand note and for releasing/energising new connections, split by city class and by the above-150 kW HT/EHT cases (pp2–4).
Clause 6 allows applicants to execute connection works themselves under licensee supervision through classed licensed electrical contractors, and lists the purchase, test and transport documents they must file before charging a substation or line (p3). Clause 8 governs the period of temporary connections (p4); clause 9 fixes metering at the licensee's sub-station for HT/EHT consumers on exclusive feeders (p4). Clause 10 merges Annexures 11.1 and 11.2 into a single Annexure 1 (p4), and clause 11 revises the category-wise load factor table in Annexure 11.19 of the 2024 second amendment (pp4–5). The annexure reproduces the New Service Connection Application Form and the applicant's declaration (pp6–8).
Read with this
The regulation
- Dated 17 Oct 2011Tripura Electricity Supply Code, 2011
Amendments and corrections
Proposed changes (drafts with no final yet)
- Dated 23 Dec 2025Electricity Supply Code, 2011 — Third Amendment, 2025 — Draft
Voltaic last read TERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.