Skip to content

TERC · Tripura Electricity Regulatory Commission

Electricity Supply Code Regulations, 2011 — 1st and 2nd Amendments, 2013 and 2014

TERC (Electricity Supply Code) Regulation, 2011 - 1st Amendment & 2nd Amendment

AmendmentDated 6 Aug 2013Published in the Gazette 29 Oct 2013F. 25 I TERC I 09 1270

Amends the Tripura Electricity Supply Code, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on terc.tripura.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-in-one gazette compilation: the Tripura Electricity Regulatory Commission's 1st and 2nd amendments to its Electricity Supply Code Regulations, 2011 — the principal regulations brought into force by gazette publication on 13 March 2012 (p1, p4). Both amendments are made under section 50 and section 181(2)(x) of the Electricity Act, 2003 and take effect from their respective dates of gazette publication.

The 1st Amendment, 2013 (notification dated 6 August 2013; gazette of 29 October 2013; pp1–3) rewrites six provisions. It narrows Regulation 3.2 to installations with contracted load up to 3 kW, excluding irrigation pumping and agricultural services (p1). It defers revision of security deposits until the licensee's information system is fully developed and operationalised (Reg 4.116), sets a 30-day window with an interest consequence for refunding deposits after agreement termination (Reg 4.118), requires deposits to be shown on demand (Reg 4.121) — all at p2 — replaces the security deposit formula in Annexure II.18 (Reg 4.6) with a load-, load-factor- and tariff-based computation carrying a paying-capacity factor (p2), and lists the nineteen particulars that must appear on a consumer bill (Reg 6.7, p3).

The 2nd Amendment, 2014 (notification dated 10 January 2014; gazette of 5 August 2014; pp4–7) re-issues Annexure II.18 as a full annexure containing the same deposit formula plus a category-wise load-factor table (p5), and replaces Annexure II.19 (Reg 7.49) with the stolen-energy assessment method: a load × period × hours × load-factor formula keyed to a category-wise load-factor table (p6), and a separate simplified formula for temporary connections (p7).

Standard name
Electricity Supply Code
Primary topics
Security deposit, Theft and unauthorised use, Billing and payment

Read with this

The regulation

Amendments and corrections

Proposed changes (drafts with no final yet)

Voltaic last read TERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on terc.tripura.gov.in ↗

Report an issue with this document