Skip to content

TERC · Tripura Electricity Regulatory Commission

Tripura Electricity Supply Code, 2011

TRIPURA Electricity Supply Code

RegulationDated 17 Oct 2011No.F.25/TERC/2009 dated the 17thOctober, 2011

2 amendments to it are on Voltaic, the latest dated 31 Jan 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on terc.tripura.gov.in ↗

Summary

Summary written by software, from pages 1 to 32 of 101. Check the regulator's original before you rely on it.

The Tripura Electricity Regulatory Commission issued the TERC Electricity Supply Code Regulations-2011 on 17 October 2011 (p1), made under Sections 50 and 181(2)(x) of the Electricity Act 2003 and superseding an earlier 2005 supply code notification (p4). It comes into force on the date of publication in the Tripura Gazette. The Code defines the mutual obligations of distribution licensees and consumers, and applies to all distribution and retail supply licensees (including deemed licensees) and all consumers in Tripura, as well as exempted persons and cases of unauthorised supply or use (p5).

The pages contain Chapter 1 (short title, scope, commencement), Chapter 2 (definitions and interpretation rules, pp6–12), Chapter 3 (system of supply and classification of consumers, pp13–14), and Chapter 4 (procedure for release of new connections and modifications to existing connections, pp15–32 in the portion seen). Chapter 4 sets out the licensee's obligation to supply, cost-sharing principles for extending and upgrading the distribution system, conditions for grant of connection, application forms and processing, timelines for inspection, demand notes and energisation, temporary supply including a Tatkal scheme, and procedures for transfer of connection, conversion of services, shifting of meter or connection, reclassification and load enhancement and reduction. The Table of Contents (pp2–3) lists later chapters on metering (p41), billing (p49), theft and unauthorised use (p58), disconnection and reconnection (p67), general provisions (p70), and a full annexure of forms and formats (from p72).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Metering

Read with this

Proposed changes (drafts with no final yet)

Voltaic last read TERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of TERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on terc.tripura.gov.in ↗

Report an issue with this document