Skip to content

TERC · Tripura Electricity Regulatory Commission

Electricity Supply Code, 2011 — Third Amendment, 2025 — Draft

TERC (Electricity Supply Code) Regulations, 2011 (Third Amendment), 2025

Draft amendmentDated 23 Dec 2025No.F.25/TERC/2025/1294 dated 23 rd December, 2025

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on terc.tripura.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft third amendment to the TERC (Electricity Supply Code) Regulations, 2011, issued by the Tripura Electricity Regulatory Commission on 23 December 2025. It records that the Ministry of Power has identified changes to the Supply Code and related regulations for 'Ease of Living' for consumers, and that TSECL and TREDA requested specific operational and regulatory changes. The Commission therefore proposes to amend the Principal Code (p1).

Clause 1 gives the short title and commencement: the regulations come into force from publication in the Tripura Gazette, though no Gazette date is printed. It also makes the regulation applicable to grid-interactive solar rooftop photovoltaic systems with or without battery energy storage systems, installed and commissioned in DISCOM areas in Tripura (p1).

Clause 2 substitutes the supply-voltage schedule in Regulation 3.2. The replacement text, numbered 5.3, sets out the voltage at which supply is generally given according to contracted load, covering irrigation and agricultural services, high-tension, extra-high-tension and higher EHT loads (p1–2).

Clause 3 adds a proviso to Regulation 4.6. In electrified areas up to 150 kW, new-connection charges are to be fixed by the distribution licensee based on load, category of connection and the licensee's average cost of connection; they are payable at application, and the licensee must make connection charges available online for connected load up to 150 kW (p2).

Clause 4 amends Regulation 5.7. Where an HT/EHT consumer is supplied on an independent feeder for exclusive use, metering is to be installed at the substation (sending end) on the high-voltage side, and that meter is used exclusively for billing (p2).

The document ends with the order of the Commission, signed by the Secretary (p2). It does not state a Gazette publication date, savings clause or repeal.

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, Connection and miscellaneous charges, Metering

Read with this

Voltaic last read TERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on terc.tripura.gov.in ↗

Report an issue with this document