KERC · Karnataka Electricity Regulatory Commission
Fuel and Power Purchase Cost Adjustment (First Amendment) Regulations, 2023 — Draft
KERC (Fuel and Power Purchase Cost Adjustment) (First Amendment) Regulations, 2023
Draft amendmentDated 12 Jan 2023B/5/12 dated 12.01.2023
Draft
A proposal that has since been finalised as the Fuel and Power Purchase Cost Adjustment (First Amendment) Regulations, 2023.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft amendment notified by the Karnataka Electricity Regulatory Commission for public comment. It proposes to move the Fuel and Power Purchase Cost Adjustment mechanism in the KERC (FPPCA) Regulations, 2022 from a quarterly cycle to a monthly one, so that variations in fuel and power purchase cost pass through to consumer tariffs every month (p1, p3).
Pages 1–2 are the recitals and consultation notice. The parent 2022 Regulations were notified on 21.10.2022 and gazetted on 5 November 2022; a removal-of-difficulties order followed on 22.12.2022; and the Central Government's Electricity (Amendment) Rules, 2022 (dated 29 December 2022) require, under Rule 14, a formula for automatic monthly pass-through with true-up and forfeiture of recovery rights where the licensee fails to compute and charge in time. The draft invites views, objections or suggestions within fifteen days of gazette publication (p2).
The operative text starts on p3 with title and commencement, then runs as a two-column table of clause-wise amendments (pp3–8). The definitions of 'billing quarter' and FPPCA are replaced with 'billing month' and a monthly FPPCA covering both recovery and refund; clauses 3 and 3.1 move from quarterly collection to monthly computation of collection or refund, and the existing per-unit ceiling provisos give way to an instruction that inter-licensee energy-balancing receivables and payables be excluded from total power purchase cost. Clause 4.3's pre-quarter computation window becomes pre-billing-month computation, and new clauses 4.4, 4.5 and 4.6 add a mandatory FPPCA order before each billing month, filing of documents with the Commission by the 15th of that month, half-yearly true-up, forfeiture for failure to charge, a capped carry-forward to soften tariff shock, and publication by the SLDC of reconciled monthly energy accounts. Clause 5's formula components — Q, S and Adjustment Factor (Z) — are redefined for the monthly cycle; clause 6.3 certification is updated; clause 7.1 is deleted and clause 7.2 shifts consumer disclosure from newspapers to the licensee's website. Formats 1–4 are revised as annexed and Format 5 discontinued (p8).
Read with this
The regulation
- Dated 21 Oct 2022Fuel and Power Purchase Cost Adjustment Regulations, 2022
Amendments and corrections
Procedures and orders made under it
2 more documents belong here and are not on Voltaic: 2 copies in another language.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.