Skip to content

KERC · Karnataka Electricity Regulatory Commission

Fuel and Power Purchase Cost Adjustment Regulations, 2022

KERC (Fuel and Power Purchase Cost Adjustment) Regulations, 2022

RegulationDated 21 Oct 2022No. B/15/12/ FTS-1011/ dated 21.10.2022

1 amendment to it is on Voltaic, dated 23 Feb 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Karnataka Electricity Regulatory Commission (Fuel and Power Purchase Cost Adjustment) Regulations, 2022 — Notification No. B/15/12/FTS-1011 dated 21.10.2022 — build the mechanism by which Karnataka's distribution licensees pass changes in fuel and power purchase cost through to consumers. The preamble records the draft regulations gazetted on 12.07.2022, the objections received, and the public hearing held on 14.10.2022 (p1). The regulations take effect from the date of their notification in the official gazette (p2), and the first billing quarter begins 1 January 2023 (p3).

Regulations 2–3 set the vocabulary of the scheme and oblige every distribution licensee to recover FPPCA from consumers as part of tariff. Recovery — and equally the pass-through of a negative FPPCA — is capped at ten paise per unit, or such other limit as the tariff order for the year fixes, beyond which the Commission's prior approval is required (p2–3). Regulation 4 sets the computation basis: a per-unit FPPCA derived from the net variation in fuel and power purchase cost on energy bought from generating stations and long-term IPPs, with sales arrived at after deducting Commission-approved transmission and distribution losses and reconciling with SLDC, the computation ordinarily to be finished 45 days before the billing quarter (p3). Regulation 5 gives the formula and defines each of its terms — CSG, CCGS, CIPP, Q, Z and S — and itemises what the adjustment factor Z must capture, including earlier un-adjusted over/under recovery and variations the Commission notices on post-facto validation (p3–5).

Regulations 6–7 govern accounting, billing and disclosure: FPPCA shown separately in consumer bills and under a separate head of account, expressed in whole paise per unit, signed by an authorised representative and certified by a chartered accountant, filed with the Commission 30 days before the quarter and published in one English and one Kannada newspaper at least a week before it, with copies posted on the licensees' websites (p5–6). Regulation 8 repeals the 2013 Fuel Cost Adjustment Charges Regulations with a savings clause; Regulations 9 and 10 give the Commission power to remove difficulties and to amend (p6). The Annexure (pp7–11) prescribes the five formats licensees must use, from station-wise cost variation and the adjustment-factor working to energy and loss statements and thermal station fixed and variable cost details.

Standard name
Fuel and Power Purchase Cost Adjustment
Primary topics
Fuel and power purchase cost adjustment, Billing and payment

Read with this

Amendments and corrections

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of KERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document