KERC · Karnataka Electricity Regulatory Commission
Fuel and Power Purchase Cost Adjustment Regulations, 2022 — Removal of Difficulties Order, 2022
In the matter of removal of difficulties in implementing the Provisions of Fuel and Power Purchase Cost Adjustment (FPPCA) Regulations, 2022 notified by the Commission by its Notification No. B/15/12/FTS-1011/dated 21st October 2022.
OrderDated 22 Dec 2022
Made under the Fuel and Power Purchase Cost Adjustment Regulations, 2022.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a short KERC order of 22 December 2022 that uses the difficulty-removal clause of its own Fuel and Power Purchase Cost Adjustment (FPPCA) Regulations, 2022 to fix four practical problems the Commission found when ESCOMs tried to compute FPPCA. The preamble (p1–2) walks through each problem: the factor 'S' in the Clause-5 formula was notated as the whole amount realised from selling purchased power on energy exchanges, which would deduct full sale proceeds rather than the incremental gain or loss; FORMAT-1 could not distinguish fixed from variable cost per unit, so approved versus actual purchase cost could not be reconciled; FORMAT-3 deducted exchange/bilateral energy sales from energy at the interface point instead of from energy at the generation point; and FORMAT-5 became redundant once FORMAT-1 was redesigned.
The operative ORDER (p2) does three things. A. It re-notates factor 'S' in Clause 5 as the incremental gain or loss on sale of purchased power through energy exchanges or other agencies over the average power purchase cost for the quarter. B. It substitutes revised FORMAT-1 and FORMAT-3 as appended (p3–4). C. It discontinues FORMAT-5.
The appended FORMAT-1 (p3) is a quarterly purchase-cost reconciliation by station and by purchase category — state generating stations, central generating stations, IPPs, renewable sources and other purchases — plus transmission charges and other costs, with a deduction line for exchange/bilateral energy sales and a line for energy balancing transactions, producing a per-quarter difference between approved and actual power purchase cost. FORMAT-3 (p4) is a monthly energy table running from energy purchased at the generation bus (including exchange sales) through net purchases to the ESCOM, energy at interface point, DCB energy sales and distribution loss. Only the two formats are annexed; no application form, fee or timeline is set, and the order states no separate commencement date beyond the date it was signed and issued.
Read with this
The regulation
- Dated 21 Oct 2022Fuel and Power Purchase Cost Adjustment Regulations, 2022
Amendments and corrections
Earlier drafts
2 more documents belong here and are not on Voltaic: 2 copies in another language.