Skip to content

KERC · Karnataka Electricity Regulatory Commission

Fuel and Power Purchase Cost Adjustment (First Amendment) Regulations, 2023

KERC (Fuel and Power Purchase Cost Adjustment) (First Amendment) Regulations, 2023

AmendmentDated 23 Feb 2023No.B/5/12/2807 dated 23.02.2023

Amends the Fuel and Power Purchase Cost Adjustment Regulations, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The notification is KERC's first amendment to its 2022 Fuel and Power Purchase Cost Adjustment (FPPCA) Regulations, issued at Bengaluru on 23.02.2023 (p3). The preamble explains that the 2022 regulations provided a quarterly FPPCA methodology, while the Central Government's Electricity (Amendment) Rules, 2022, notified on 29.12.2022, require the Appropriate Commission to specify a formula for automatic monthly pass-through of fuel and power purchase cost variations, with annual true-up (p3–4). KERC therefore proposes to align its regulations with Rule 14 and records that draft amendments were gazetted on 12.01.2023, hosted on the Commission's website, and taken through a public hearing on 23.02.2023 (p4).

Regulation 1 gives the short title and states that the regulations take effect from the date of publication in the official gazette. The operative changes are set out in an 'As Existing / As proposed' table running from page 5 to page 10. It substitutes definitions to replace the billing quarter with a billing month, revises the FPPCA definition around recovery or refund in a billing month, and adjusts collection, computation, adjustment-factor (Z) and change-in-fuel-and-power-purchase-cost provisions accordingly (p5–10). The table also changes documentation and filing/publication requirements: clause 7.1 appears deleted and clause 7.2 is expanded to require publication of FPPCA formula, calculations and Commission-approved portions on the distribution licensee's website, with archiving (p10). The Commission's approval and Secretary's signature appear on page 11.

Four annexure formats follow: Format-1 for monthly FPPCA charges with notes; Format-2 for computation of Adjustment Factor (Z); Format-3 for energy at generation point, interface point and energy sales; and Format-4 for projected energy sales for the billing month (p11–14). The preamble also quotes Rule 14's forfeiture consequence for failure to charge FPPCA within time except force majeure, and annual true-up by 30 June; the operative table appears to carry related provisions but is fragmentary (p4, p8).

Standard name
Fuel and Power Purchase Cost Adjustment
Primary topics
Fuel and power purchase cost adjustment

Read with this

The regulation

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document