CERC · Central Electricity Regulatory Commission
Procedure, Terms and Conditions for Grant of Transmission Licence Regulations, 2009
Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of Transmission Licence and other related matters) Regulations, 2009
RegulationDated 26 May 2009No. L-7/165(180)/2008-CERC dated the 26th May 2009
Replaced by Procedure, Terms and Conditions for Grant of Transmission Licence Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's principal regulation for how a licence to construct, own, operate and maintain an inter-State transmission project is applied for, granted, amended, revoked and policed. It replaces the Commission's 2003 transmission licensing regulations (p19) and is made under s.178 of the Electricity Act, 2003, coming into force from the gazette publication date, which is not printed (p1).
Chapters I–II (pp1–5) fix the definitions that drive eligibility — deemed licensee, long-term customer, state owned or controlled company, transmission plan — and route selection of projects through the Empowered Committee under the Central Government's competitive-bidding guidelines, leaving non-bid projects to the Central Transmission Utility, deemed licensees or a state owned/controlled company identified as developer by a stated cut-off date.
Chapter III (pp5–8) is the operational core: eligibility categories, application in Form I with affidavit, service on long-term customers, website posting, newspaper notice in Form II, the objection window, defect rectification, CTU recommendations (non-binding), hearings, and the Commission's own pre-grant public notice before issue of the licence in Form III.
Chapter IV (pp8–9) deals with transmission charges: adoption under s.63 for competitively bid projects, determination under s.61 in other cases, and contractual treatment of change in law.
Chapter V (pp9–17) sets the terms and conditions of licence: licensee obligations on insurance, time-bound construction and O&M to prudent utility practice, compliance with NLDC/RLDC directions and the Commission's power to hand over operations where availability is not maintained, non-discriminatory open access, licence fee, separate accounts and annual audited statements; a prohibition on electricity trading; assignment to a lenders' nominee on default; the term of licence and its extension with tariff arrangements beyond it (reg 13, as substituted by an amendment dated 25.5.2010); and grounds and procedure for revocation.
Chapter VI (pp17–19) covers securing compliance with licence conditions, dispute resolution, communication, power to relax and repeal with savings for projects approved earlier. Forms I–III and the licence Schedule (pp20–27) supply the prescribed formats.
Read with this
Amendments and corrections
Commencement notices and reasons
Other copies of these documents (2)
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.