CERC · Central Electricity Regulatory Commission
Grant of Transmission Licence (Amendment) Regulations, 2010
Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of Transmission Licence and other related matters) (Amendment) Regulations, 2010
Amendment · Gazette copyDated 25 May 2010Published in the Gazette 26 May 2010No. L-7/165(180)/2008-CERC dated 25th May, 2010
Replaced by Procedure, Terms and Conditions for Grant of Transmission Licence Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
The Gazette copy of the Procedure, Terms and Conditions for Grant of Transmission Licence (Amendment) Regulations, 2010.
Summary
Summary written by software. Check the regulator's original before you rely on it.
A two-page CERC notification gazetted on 26 May 2010 (p1) that substitutes Regulation 13 of the 2009 transmission-licensing regulation wholesale (p2). Nothing else in the parent regulation is touched, so the document is best read as a single-clause rewrite of the licence-term regime for transmission licensees.
The substituted Regulation 13 makes the term of a transmission licence a fixed period from the date of issue (25 years in the text), extendable where the asset's useful life runs longer, on a case-by-case application to be filed ahead of expiry (p2). It gives the Commission a residual power to direct or scheme the operation of assets where the licensee does not seek extension, so consumers are protected. It then splits assets into four tariff tracks: assets already under a Commission-determined tariff, assets bid out under Section 63 where the RFP or award predates this notification, future competitively bid projects, and renovation-and-modernisation costs. For the pre-existing bid projects it prescribes guidelines for the equity base and for carrying over the tariff norms of the period in which the initial licence term expires; for future bids it requires bidders to quote a tariff extending beyond the initial term for bid evaluation; and for R&M it requires cost approval alongside the fresh-licence application (p2).
Practically, this is the instrument that changed how long a CERC transmission licence lasts and how tariff is settled on the tail-end of an asset's life.
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
Other copies of these documents (1)
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.