CERC · Central Electricity Regulatory Commission
Transmission Licence Regulations, 2009 — 2010 Amendment — Statement of Reasons
Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of Transmission Licence and other related matters) (Amendment) Regulations, 2010
Statement of reasonsDated 14 May 2010No.L-7/165(180)/2008-CERC dated 14.5.2010
Replaced by Procedure, Terms and Conditions for Grant of Transmission Licence Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the Procedure, Terms and Conditions for Grant of Transmission Licence Regulations, 2009 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's Statement of Reasons (p1) setting out its reasoning and decisions on the draft amendment to Regulation 13 of the CERC (Procedure, Terms and Conditions for grant of Transmission Licence and other related matters) Regulations, 2009. It is not the amending regulation itself — the operative text sits elsewhere, and paragraph 15 only directs the Secretary to finalise the amendment and take steps for notification (p6).
The problem it addresses (p1–2): transmission assets have a useful life longer than the licence term fixed under Section 15(8) of the Electricity Act, 2003, so assets can remain in service after the licence ends with no provision for transfer and no answer on tariff. The Commission sent statutory advice to the Ministry of Power under Section 79(2) to modify the Standard Bid Document and allow bidding over the asset's full life, and proposed amendments to Regulation 13.
One stakeholder, Reliance Power Transmission Limited, responded to the public consultation (comments were invited by 01.03.2010, p2). The document works through its points. Where a licensee does not apply for renewal, a proviso to Regulation 13(1) lets the Commission issue directions or formulate schemes to keep assets operating for the remaining useful life (p2–3). For Regulation 13(4), it specifies how tariff beyond the initial licence term is determined for projects already bid or awarded — equity-based return capped by reference to gross block, no depreciation after the first term apart from salvage, and R&M through a fresh application (p3–4). It accepts RPTL's drafting change from 'Capital Base' to 'equity base' (p4). For new projects, bidders will quote over the full asset life while the licence remains shorter (p4–5). On Regulation 13(5) it agrees only partly with RPTL — competitive bidding may cover the whole asset life — and retains the Commission's Section 62 role for periods where competitively bid tariff is unavailable (p5). It deletes Regulation 13(4)(iii) and inserts a single new clause (6) giving one R&M route for both categories (p6).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 26 May 2009Transmission Licence Regulations — Statement of Reasons, 2009
Other copies of these documents (2)
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.