WBERC · West Bengal Electricity Regulatory Commission

Electricity Supply Code, 2013 — First Amendment, 2026

West Bengal Electricity Regulatory Commission (Electricity Supply Code) (First Amendment) Regulations, 2026

AmendmentDated 21 Sep 2026Published in the Gazette 22 Sep 202683/WBERC dated 21st September, 2026

Amends the West Bengal Electricity Supply Code Regulations, 2013.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This notification is the First Amendment to the West Bengal Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2013. It extends to the whole of West Bengal and is expressed to come into force on publication in the Official Gazette; the notification is dated 21 September 2026 and the Gazette header is dated 22 September 2026 (p1).

Clause 1 gives the short title, territorial extent and commencement. Clause 2 inserts two new regulations after Regulation 5.4 of the Principal Regulations (p1–2).

New Regulation 5.4.A requires provisional and final assessment orders to show detailed computations transparently. It lists the minimum contents of the computation sheet: the nature of unauthorised use; consumer number, name and address; meter number; connected voltage; contracted load and inspected load; the basis for the inspected load, including inspection records, photographs or instrument readings; the applicable tariff category; energy and demand/fixed charges; electricity duty; the break-up under clause (a), (b) or (c) of Regulation 5.1; and the date of the order. The total is to be rounded to the nearest rupee. If the consumer number or meter number is unavailable, the order must state the reason (p1–2).

New Regulation 5.4.B requires the assessing officer to photograph the premises, service line, meter and seals, and the loads found connected, so that the nature of the unauthorised use and the inspected load are apparent. The photographs must carry the date and time of capture and must be served with the provisional assessment order. If obstruction prevents photography, the assessing officer must record that fact in the inspection report and in the provisional assessment order (p2).

The amendment is signed by the Deputy Director, WBERC. It does not itself repeal or replace any provision; it adds documentary and computation requirements to the Supply Code assessment process (p1–2).

Standard name
Electricity Supply Code
Primary topics
Theft and unauthorised use

Read with this

The regulation

Commencement notices and reasons

Earlier drafts

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document