AmendmentDated 21 Sep 2026Published in the Gazette 22 Sep 202683/WBERC dated 21st September, 2026
Amends the West Bengal Electricity Supply Code Regulations, 2013.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This notification is the First Amendment to the West Bengal Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2013. It extends to the whole of West Bengal and is expressed to come into force on publication in the Official Gazette; the notification is dated 21 September 2026 and the Gazette header is dated 22 September 2026 (p1).
Clause 1 gives the short title, territorial extent and commencement. Clause 2 inserts two new regulations after Regulation 5.4 of the Principal Regulations (p1–2).
New Regulation 5.4.A requires provisional and final assessment orders to show detailed computations transparently. It lists the minimum contents of the computation sheet: the nature of unauthorised use; consumer number, name and address; meter number; connected voltage; contracted load and inspected load; the basis for the inspected load, including inspection records, photographs or instrument readings; the applicable tariff category; energy and demand/fixed charges; electricity duty; the break-up under clause (a), (b) or (c) of Regulation 5.1; and the date of the order. The total is to be rounded to the nearest rupee. If the consumer number or meter number is unavailable, the order must state the reason (p1–2).
New Regulation 5.4.B requires the assessing officer to photograph the premises, service line, meter and seals, and the loads found connected, so that the nature of the unauthorised use and the inspected load are apparent. The photographs must carry the date and time of capture and must be served with the provisional assessment order. If obstruction prevents photography, the assessing officer must record that fact in the inspection report and in the provisional assessment order (p2).
The amendment is signed by the Deputy Director, WBERC. It does not itself repeal or replace any provision; it adds documentary and computation requirements to the Supply Code assessment process (p1–2).
Read with this
The regulation
- Dated 7 Aug 2013West Bengal Electricity Supply Code Regulations, 2013
Commencement notices and reasons
Earlier drafts
- Dated 27 Aug 2026Electricity Supply Code, 2013 — First Amendment, 2026 — Draft
- Released with the draft dated 27 Aug 2026Explanatory memorandum: Electricity Supply Code, 2013 — First Amendment, 2026 — Explanatory Memorandum — Draft