Statement of reasonsDated 21 Sep 202683/WBERC dated 21st September, 2026
The commission's reasons for the West Bengal Electricity Supply Code Regulations, 2013 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Commission's statement of reasons for the West Bengal Electricity Regulatory Commission (Electricity Supply Code) (First Amendment) Regulations, 2026, issued as No. 83/WBERC dated 21 September 2026 (p1, p7). It explains why the Commission is inserting two new regulations — 5.4.A and 5.4.B — after Regulation 5.4 of the 2013 Electricity Supply Code (p3).
The opening sections set the statutory backdrop: section 50 of the Electricity Act 2003 requires a supply code, section 181(1) with clause (x) of section 181(2) is the regulation-making power, and section 181(3) with the Electricity (Procedure for Previous Publication) Rules, 2005 requires prior publication (p1–2). The need arises because the Principal Regulations of 07.08.2013 prescribe a methodology for assessment under section 126 but not the minimum particulars an assessment order must disclose — a gap flagged by the Calcutta High Court's judgment of 06.02.2026 in WPA 15778 of 2025 and WPA 14147 of 2025 (p2). The consultation section records the public notice of 27.08.2026, a comment deadline of 16.09.2026, and that only CESC responded (p3).
On Issue 1, the Commission explains that Regulation 5.4.A requires a transparent computation sheet identifying the person and connection, recording the nature and extent of unauthorised use, and stating the tariff and method of computation (p3–4). It declines CESC's "if any" drafting but adds a proviso requiring reasons where a consumer or meter number does not exist, and modifies clause (vii) to require disclosure of the basis for the inspected load without prescribing methods of load determination (p4–5).
On Issue 2, Regulation 5.4.B makes dated photographs of the premises, service line, meter and seals, unauthorised use and inspected load a uniform obligation, served with the provisional order (p5–6). Accepting CESC's objection, the Commission drops the requirement of two independent witnesses where obstruction prevented photography, leaving a recorded statement in the inspection report and the provisional assessment order (p6–7).
The concluding decision finalises the amendment with these modifications and states it comes into force on Gazette publication (p7).
Read with this
The regulation
- Dated 7 Aug 2013West Bengal Electricity Supply Code Regulations, 2013
Amendments and corrections
- Dated 21 Sep 2026Electricity Supply Code, 2013 — First Amendment, 2026
Earlier drafts
- Dated 27 Aug 2026Electricity Supply Code, 2013 — First Amendment, 2026 — Draft
- Released with the draft dated 27 Aug 2026Explanatory memorandum: Electricity Supply Code, 2013 — First Amendment, 2026 — Explanatory Memorandum — Draft