Skip to content

WBERC · West Bengal Electricity Regulatory Commission

Electricity Supply Code (First Amendment) Regulations, 2026 — Statement of Reasons

West Bengal Electricity Regulatory Commission (Electricity Supply Code) (First Amendment) Regulations, 2026

Statement of reasonsDated 21 Sep 202683/WBERC dated 21st September, 2026

The commission's reasons for the West Bengal Electricity Supply Code Regulations, 2013 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Commission's statement of reasons for the West Bengal Electricity Regulatory Commission (Electricity Supply Code) (First Amendment) Regulations, 2026, issued as No. 83/WBERC dated 21 September 2026 (p1, p7). It explains why the Commission is inserting two new regulations — 5.4.A and 5.4.B — after Regulation 5.4 of the 2013 Electricity Supply Code (p3).

The opening sections set the statutory backdrop: section 50 of the Electricity Act 2003 requires a supply code, section 181(1) with clause (x) of section 181(2) is the regulation-making power, and section 181(3) with the Electricity (Procedure for Previous Publication) Rules, 2005 requires prior publication (p1–2). The need arises because the Principal Regulations of 07.08.2013 prescribe a methodology for assessment under section 126 but not the minimum particulars an assessment order must disclose — a gap flagged by the Calcutta High Court's judgment of 06.02.2026 in WPA 15778 of 2025 and WPA 14147 of 2025 (p2). The consultation section records the public notice of 27.08.2026, a comment deadline of 16.09.2026, and that only CESC responded (p3).

On Issue 1, the Commission explains that Regulation 5.4.A requires a transparent computation sheet identifying the person and connection, recording the nature and extent of unauthorised use, and stating the tariff and method of computation (p3–4). It declines CESC's "if any" drafting but adds a proviso requiring reasons where a consumer or meter number does not exist, and modifies clause (vii) to require disclosure of the basis for the inspected load without prescribing methods of load determination (p4–5).

On Issue 2, Regulation 5.4.B makes dated photographs of the premises, service line, meter and seals, unauthorised use and inspected load a uniform obligation, served with the provisional order (p5–6). Accepting CESC's objection, the Commission drops the requirement of two independent witnesses where obstruction prevented photography, leaving a recorded statement in the inspection report and the provisional assessment order (p6–7).

The concluding decision finalises the amendment with these modifications and states it comes into force on Gazette publication (p7).

Standard name
Electricity Supply Code
Primary topics
Theft and unauthorised use

Read with this

The regulation

Amendments and corrections

Earlier drafts

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document