Skip to content

WBERC · West Bengal Electricity Regulatory Commission

West Bengal Electricity Supply Code Regulations, 2013

West Bengal Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2013

RegulationDated 7 Aug 2013Published in the Gazette 7 Aug 2013No. 55/WBERC dated the 7th August, 2013

1 amendment to it is on Voltaic, dated 21 Sep 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software, from pages 1 to 19 of 28. Check the regulator's original before you rely on it.

The West Bengal Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2013 are the State's principal consumer-supply code. Issued as Notification No. 55/WBERC and gazetted on 7 August 2013, they extend to the whole of West Bengal and came into force on Gazette publication (p1). The opening clause says they supersede Notification No. 36/WBERC dated 12 September 2007 and roots the code in the Electricity Act, 2003 and the 2005 Removal of Difficulties Order (p1).

Regulations 1–2 (pp1–3) set the title, commencement and definitions. Chapter 3 (pp3–15) is the billing and payment code: meter-reading and bill issue cycles; mandatory bill particulars; collection centres and payment channels including ECS, cards, online and RTGS; recovery of arrears; disputed bills; billing for defective or defunct meters, inaccessible meters and unusual consumption; notional suspension for LV/MV domestic consumers; bill preservation; and metering, including a smart-metering framework subject to Commission orders. Chapter 4 (pp15–18) governs disconnection for non-payment, theft or unauthorised use, safety risks, consumer request and wrong declarations, and deemed termination of agreement after prolonged disconnection. Chapter 5 (pp18–19) gives the provisional-assessment method under section 126 and related section 127 appeal/recovery machinery, with a load-factor table by voltage and consumer category.

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, Billing and payment, Metering

Read with this

Amendments and corrections

Commencement notices and reasons

Earlier drafts

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of WBERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document