WBERC · West Bengal Electricity Regulatory Commission
Electricity Supply Code, 2013 — First Amendment, 2026 — Draft
West Bengal Electricity Regulatory Commission (Electricity Supply Code) (First Amendment) Regulations, 2026
Draft amendmentDated 27 Aug 2026WBERC/ Regulation-82/26-27/ 1487 dated 27th August, 2026
Draft
A proposal that has since been finalised as the Electricity Supply Code, 2013 — First Amendment, 2026.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a consultation package: WBERC's public notice (p1) inviting comments, suggestions and objections on a draft First Amendment to its Electricity Supply Code Regulations, 2013, with a deadline of 16 September 2026, 3 P.M., at the Commission's New Town, Kolkata office; the draft is also posted on the Commission's website (p1).
The draft notification itself (pp2–3) is short. It inserts two new regulations after Regulation 5.4 of the Principal Regulations, both governing how the assessing officer documents cases of unauthorised use of electricity.
Inserted Regulation 5.4.A requires provisional and final assessment orders to show detailed computations transparently, and lists the minimum particulars the computation sheet must carry — the nature of the unauthorised use, consumer and meter identification, connected voltage, contracted and inspected load, applicable tariff category and rates, electricity duty, the break-up of the amount computed under the relevant clause of Regulation 5.1, and the date of the order — with the total rounded to the nearest rupee (pp2–3).
Inserted Regulation 5.4.B requires the assessing officer to photograph the premises, service line, meter and seals, and the loads found connected, in a manner that makes the unauthorised use and inspected load apparent, with date and time of capture, served along with the provisional assessment order. A proviso addresses obstruction at the premises: the fact must be recorded in the inspection report before two independent witnesses and stated in the provisional assessment order (p3).
The amendment extends to the whole of West Bengal and comes into force on publication in the Official Gazette (p2).
Read with this
The regulation
- Dated 7 Aug 2013West Bengal Electricity Supply Code Regulations, 2013
Amendments and corrections
- Dated 21 Sep 2026Electricity Supply Code, 2013 — First Amendment, 2026
Commencement notices and reasons
Earlier drafts
- Released with the draft dated 27 Aug 2026Explanatory memorandum: Electricity Supply Code, 2013 — First Amendment, 2026 — Explanatory Memorandum — Draft
Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.