HPERC · Himachal Pradesh Electricity Regulatory Commission
Distribution Performance Standards Regulations, 2010 — Second Amendment, 2022 — Draft
Himachal Pradesh Electricity Regulatory Commission (Distribution Performance Standards )(Second Amendment) Regulations, 2022
Draft amendmentDated 8 Mar 2022HPERC/381 dated 08th March, 2022
Draft
A proposal that has since been finalised as the Distribution Performance Standards Regulations, 2010 — Second Amendment, 2022.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft amendment regulation issued by the Himachal Pradesh Electricity Regulatory Commission on 8 March 2022 and published for objections and suggestions for thirty days from its publication in the Rajpatra (p1–2). It proposes the second amendment to the HPERC (Distribution Performance Standards) Regulations, 2010 — notified 8 October 2010, published 12 October 2010, and amended on 30 April 2011 — expressly to align those regulations with the Ministry of Power's Electricity (Rights of Consumers) Rules, 2020 (p1).
The operative text touches seven regulations. Clause 2 widens a definitional reference from "the Act" to "the Act or The Rules" (p2). Clause 3 is the centre of gravity: Regulation 5 is reworked so that compensation timelines change, the escalation route to the Consumer Grievance Redressal Forum and Ombudsman is restated, and new sub-regulations (6) to (12) build a regime of automatic compensation — a smart-metering roadmap for remotely monitored parameters, phased voluntary compensation for at least six consumer-related services, Commission power to add or delete parameters, enhanced compensation where automatic payment is missed or upheld only on appeal, an online claim facility, and a roadmap for automated outage monitoring (p2–6). Clause 4 changes periodic reporting to the Commission and State Government and sets a filing window after each reporting period (p6). Clause 5 bars the additional compensation from being passed through in the licensee's ARR (p7). Clause 6 updates a cross-reference to the 2013 CGRF and Ombudsman Regulations (p7).
Clause 7 is the longest: it substitutes Schedule items (1) and (2) with guaranteed standards for call centres and consumer-related services, revises the transformer categories and tightens a target level in item (3), and amends item (4) by inserting a 24x7 supply statement, dropping the reference to the Indian Electricity Rules 1956, and removing a table column (p7–19). Several licensee milestones fall due on 30 September 2022.
Read with this
The regulation
- Dated 8 Oct 2010Distribution Performance Standards Regulations, 2010
Amendments and corrections
Commencement notices and reasons
- Dated 22 Apr 2016Distribution Performance Standards Regulations, 2010 — 1st Amendment, 2011 — Statement of Objects and Reasons
- Dated 29 Apr 2022Distribution Performance Standards (Second Amendment) Regulations, 2022 — Finalisation Order
- Dated 1 Dec 2025Distribution Performance Standards Regulations, 2010 — Third Amendment, 2025 — Finalisation Order
Procedures and orders made under it
Earlier drafts
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.