Distribution Performance Standards Regulations, 2010 — Third Amendment, 2025

Himachal Pradesh Electricity Regulatory Commission (Distribution Performance Standards) (Third Amendment) Regulations, 2025

AmendmentDated 1 Dec 2025No. HPERC-401 dated 01st December, 2025

Amends the Distribution Performance Standards Regulations, 2010.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Himachal Pradesh Electricity Regulatory Commission's notification of 1 December 2025 making the Third Amendment to its 2010 Distribution Performance Standards Regulations (p1). It runs to seven pages and touches three things a distribution licensee's compliance and customer-service teams track: the definition of hilly terrain, the reliability indices they must report, and the guaranteed standards (with compensation) for metering and temporary supply.

Regulation 2 inserts a new sub-regulation (10A) into the principal Regulations defining "Hilly Areas/terrain" as all areas/terrains above 1000 metres from mean sea level (p1). Regulation 3 substitutes Regulation 4(2) so that the reliability indices in item 4 of the Schedule override anything in Regulation 4(1) (p1). Regulation 4 replaces the hard-coded deadline "latest by 30th September, 2022" in Regulation 5(11) with a 30-day window running from publication of these amendment Regulations, and omits Regulation 5(12) (pp1–2).

The bulk of the amendment rewrites the Schedule. Item (2) substitutes sub-items E, F and Q — guaranteed standards for complaints about meters, replacement of defective/stopped/burnt metering equipment (with separate treatment for LT and HT consumers in urban, rural and remote areas), and temporary supply of power — each carrying a maximum time limit, a per-day compensation amount and an overall target level (pp2–6). Item (4) requires the licensee to supply 24x7 power to all consumer categories and to compute and report momentary and sustained interruption indices prescribed by IEEE Standard 1366 of 2003; a new sub-para (e) defines MAIFI and treats any interruption under five minutes as momentary (pp6–7).

The amendment comes into force on publication in the Himachal Pradesh Rajpatra, and no Gazette date is printed in the text (p1).

Standard name
Standards of Performance
Primary topics
Standards of performance, Metering, New connections and load changes

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document