HPERC · Himachal Pradesh Electricity Regulatory Commission
Distribution Performance Standards Regulations, 2010 — Second Amendment, 2022
Himachal Pradesh Electricity Regulatory Commission (Distribution Performance Standards )(Second Amendment) Regulations, 2022
AmendmentDated 30 Apr 2022No. HPERC/401 dated 30th April, 2022
Amends the Distribution Performance Standards Regulations, 2010.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Himachal Pradesh Electricity Regulatory Commission's Second Amendment to its Distribution Performance Standards Regulations was issued at Shimla on 30 April 2022 and takes effect on publication in the Rajpatra, Himachal Pradesh — no Gazette date is printed (p1).
Most of the amendment rewrites the compensation machinery in Regulation 5. The payment window for claims is widened from 45 to 90 days, with the new automatic-compensation cases carved out of that proviso (p1). Separate timelines are then set for when the licensee must compensate: 90 days for ordinary claims, and 30 days where automatic compensation was missed or claimed early — the latter without the 30% uplift (p2). Unresolved claims go to the Consumer Grievance Redressal Forum and then the Ombudsman under the 2013 Regulations, and compensation is paid by cheque or bill adjustment (p2–3).
New sub-regulations (6) to (12) require the licensee to build automatic, claim-free monthly compensation into its smart-metering roadmap, extend the list of remotely monitored parameters, roll out voluntary compensation for at least six Schedule-listed consumer services, and create an online claim facility and online outage monitoring — each bound to a 30 September 2022 deadline (p3–5). Under-paid automatic compensation must be at least 130% of the scheduled minimum, rising to 200% where the Forum or Ombudsman upholds a rejected claim (p4–5).
Consequential changes follow: reports under Regulation 10 go to both the Commission and the State Government within 45 days of the reporting period (p5); the additional 30%/100% compensation is denied as an ARR pass-through (p6); and references to the 2003 grievance guidelines are replaced by the 2013 CGRF and Ombudsman Regulations (p6). Regulation 7 substitutes the Schedule's Call Centre and Consumer Related Services tables — covering faults, breakdowns, transformer and meter replacement, shifting, voltage, new connections, rooftop solar, disconnection and senior-citizen service — and tightens the transformer-failure target from 5% to 3%, bringing 22/0.4 kV transformers into scope (p6–18).
Read with this
The regulation
- Dated 8 Oct 2010Distribution Performance Standards Regulations, 2010
Amendments and corrections
Commencement notices and reasons
- Dated 22 Apr 2016Distribution Performance Standards Regulations, 2010 — 1st Amendment, 2011 — Statement of Objects and Reasons
- Dated 29 Apr 2022Distribution Performance Standards (Second Amendment) Regulations, 2022 — Finalisation Order
- Dated 1 Dec 2025Distribution Performance Standards Regulations, 2010 — Third Amendment, 2025 — Finalisation Order
Procedures and orders made under it
Earlier drafts
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.