Distribution Performance Standards, 2010 — Third Amendment, 2025 — Draft

Himachal Pradesh Electricity Regulatory Commission (Distribution Performance Standards) (Third Amendment) Regulations, 2025

Draft amendmentDated 23 Sep 2025No. HPERC-401 dated 23rd September, 2025

Draft

A proposal that has since been finalised as the Distribution Performance Standards Regulations, 2010 — Third Amendment, 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft amendment notification from the Himachal Pradesh Electricity Regulatory Commission (HPERC), issued at Shimla on 23 September 2025 under No. HPERC-401 (p1). It proposes the Third Amendment to the HPERC (Distribution Performance Standards) Regulations, 2010 — the parent regulations notified on 8 October 2010 and published in the Rajpatra on 12 October 2010 (p1).

Pages 1–2 are the preamble. The Commission recites the other HPERC regulations governing supply to consumers, the Consumer Guide published by the State Electricity Board, and the Ministry of Power's Electricity (Rights of Consumers) Rules, 2020 as amended, and states that the amendment is needed to align the 2010 Regulations with those Rules. The draft is published for objections and suggestions, to reach the Secretary within 30 days of publication of the notification in the Rajpatra; the draft text is also on the Commission's website (p2).

The draft Regulations run from p2 to p8. Clause 1 gives the short title and commencement from Rajpatra publication. Clause 2 inserts a definition of "Hilly Areas/terrain" into Regulation 2 of the parent regulations (p2). Clause 3 replaces Regulation 4(2) so that the Reliability Indices in item 4 of the Schedule override the general standard (p3). Clause 4 requires the distribution licensee to create an online facility for registering and claiming compensation and to publicise it, and omits sub-regulations (11) and (12) of Regulation 5 (p3). Clause 5 rewrites parts of the Schedule: sub-items E, F and Q of item (2), covering guaranteed standards, maximum times and leviable compensation for meter complaints, meter replacement for LT (urban, rural and remote) and HT consumers, and temporary supply (p3–7); sub-para (I) of item (4), requiring 24x7 supply and computation of momentary and sustained interruption indices per IEEE Standard 1366 of 2003 (p7); and a new MAIFI sub-item with its formula and a definition of momentary interruptions (p8).

Standard name
Standards of Performance
Primary topics
Standards of performance, Metering, New connections and load changes

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.