APERC · Andhra Pradesh Electricity Regulatory Commission

Interim Balancing & Settlement Code for Open Access Transactions, 2006 — Fourth Amendment Regulation, 2019

Andhra Pradesh Electricity Regulatory Commission (Interim Balancing & Settlement Code for Open Access Transactions) Fourth Amendment Regulation, 2019.

AmendmentDated 6 Mar 2019Published in the Gazette 11 Mar 2019Regulation No. 04 of 2019 dated 06-03-2019

Amends the Interim Balancing and Settlement Code, 2006.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A two-page amendment by the Andhra Pradesh Electricity Regulatory Commission to its 2006 Interim Balancing & Settlement Code for Open Access Transactions (p1). Regulation No. 04 of 2019 is the fourth amendment to that code, after amendments in 2013, 2014 and 2016, and it comes into force on publication in the Andhra Pradesh Gazette, printed here as 11 March 2019 (p1–2).

The recitals set out the trigger: APTRANSCO represented that for all wind and solar power generators, unutilised banked energy at the end of the year should be deemed purchased at 50% of pooled cost instead of the existing 100% (p2). The Commission published the issue for stakeholder views and held public hearings on 15-12-2018 and 19-01-2019, while the Government of Andhra Pradesh promulgated its Solar Power Policy 2018 and Wind Power Policy 2018, superseding the 2015 policies (p1–2).

Operatively, the amendment makes two changes to Appendix-3 of the principal code: clause 2 is substituted so that energy injected into the grid between synchronisation and the Commercial Operation Date is treated as deemed banked energy, and the proviso to clause 3(f) is deleted (p2). The operative clauses do not restate the pooled-cost percentage APTRANSCO sought. Appendix-3 is not reproduced, so the amended code must be read with the principal 2006 regulation.

Standard name
Balancing and Settlement Code
Primary topics
Energy banking

Read with this

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document