APERC · Andhra Pradesh Electricity Regulatory Commission
Interim Balancing & Settlement Code for Open Access Transactions, 2006 — Second Amendment, 2014
~J:nRegulation may be calkd tfi~;A~dli~ Pradesh Electricity Regulatory Commiss\_ion (Interim B ·. cing & Settlement Code fur OperiA~ffl Transactions) Second Amendment Regulation, 2014.
AmendmentPublished in the Gazette 1 Apr 2014Regulation No.2 of 2!114 dated APRIL l, 2014
Amends the Interim Balancing and Settlement Code, 2006.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the APERC's Second Amendment to its 2006 Interim Balancing & Settlement Code for Open Access Transactions, published in the Andhra Pradesh Gazette on 1 April 2014 and given prospective effect from that publication date (p1–2). It is the sequel to the Government of Andhra Pradesh Solar Power Policy-2012 (GO Ms. No.39 of 26-09-2012, amended by GO Ms. No.44 of 16-11-2012) and to the First Amendment (Regulation No.1 of 2013, notified 02-05-2013) that had brought solar into the code as a renewable source; a draft was put on the Commission's website on 25-02-2014 and a public hearing held on 12-03-2014 (p1).
The operative part does three things (p2). First, it inserts a definition of "Banking" into the principal regulation below clause 2(c): banking is the facility by which unutilised or excess energy from wind, solar and mini-hydel generation is parked in a separate account during a billing month and dealt with under Appendix-3 (p2). Second, it adds a proviso to clause 10.3 so that under-drawals sourced from those three renewable sources are treated as input into banking (p2). Third, it substitutes Appendix-3 wholesale with fresh terms and conditions for the banking facility — the banking year, the form and basis of banking charges, the windows in which drawal from the bank is barred, a year-round bar on peak time-of-day drawal, what happens to energy left unutilised, the DISCOM's purchase of residual banked energy with its pricing benchmark and settlement deadline, carry-forward of late-financial-year credits, and the advance notice generators must give of time-block-wise withdrawal schedules (p2).
The practical effect is to give wind, solar and mini-hydel open access users a defined banking regime inside the settlement code, with the Commission rather than the licensees setting the commercial terms (p2).
Read with this
The regulation
- Dated 11 Aug 2006Interim Balancing and Settlement Code, 2006
Amendments and corrections
- Dated 22 Apr 2013Interim Balancing & Settlement Code for Open Access Transactions, 2006 — First Amendment Regulation, 2013
- Dated 29 Mar 2014Interim Balancing & Settlement Code for Open Access Transactions, 2006 — Second Amendment, 2014
- Dated 8 Jan 2016Interim Balancing and Settlement Code Regulation, 2006 — Third Amendment, 2016
- Dated 6 Mar 2019Interim Balancing & Settlement Code for Open Access Transactions, 2006 — Fourth Amendment Regulation, 2019
Consolidated copies, for reference (1)
Other copies of these documents (1)
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.