APERC · Andhra Pradesh Electricity Regulatory Commission
Interim Balancing & Settlement Code for Open Access Transactions, 2006 — Second Amendment, 2014
Andhra Pradesh Electricity Regulatory Commission (Interim Balancing & Settlement Code for Open Access Transactions) Second Amendment Regulation, 2014
AmendmentDated 29 Mar 2014Published in the Gazette 1 Apr 2014Regulation No.2 of 2014 dated 29-03-2014
Amends the Interim Balancing and Settlement Code, 2006.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The APERC's Second Amendment Regulation, 2014 (Regulation No.2 of 2014) amends the Commission's 2006 Interim Balancing & Settlement Code for Open Access Transactions (Regulation No.2 of 2006). It was notified in the Andhra Pradesh Gazette Extraordinary No.93 of 1 April 2014, after a draft published on the Commission's website on 25 February 2014 and a public hearing on 12 March 2014 (p1–2). It takes effect on Gazette publication and applies prospectively only (p2).
Its stated purpose is to give effect to the Government of Andhra Pradesh's Solar Power Policy-2012 (GO Ms. No.39 dated 26-09-2012, amended by GO Ms. No.44 dated 16-11-2012) and to build on the First Amendment (Regulation No.1 of 2013, notified 02-05-2013), which brought solar within the Code's renewable sources (p1).
Three operative changes follow. Clause 2 inserts a new definition of "Banking" below clause 2(c) of the principal regulation, describing it as a facility to carry forward unutilised or excess energy from wind, solar and mini-hydel sources during a billing month into a separate account dealt with under Appendix-3 (p2). Clause 3 adds a proviso to clause 10.3 so that under-drawal sourced from those same three sources is treated as input into banking (p2). Clause 4 substitutes Appendix-3 in full, restating the terms and conditions of banking for wind, solar and mini-hydel generators: the banking year, banking charges in kind, the periods and time-of-day blocks during which drawal of banked energy is barred, how energy left unutilised at year end is handled and bought by the DISCOMs, the advance notice generators must give for withdrawal schedules, and the purchase price basis, cross-referring to the Commission's RPPO/REC Regulation (1 of 2012) and to the Retail Supply Tariff Order for peak ToD hours (p2).
Read with this
The regulation
- Dated 11 Aug 2006Interim Balancing and Settlement Code, 2006
Amendments and corrections
- Dated 22 Apr 2013Interim Balancing & Settlement Code for Open Access Transactions, 2006 — First Amendment Regulation, 2013
- Published in the Gazette 1 Apr 2014Interim Balancing & Settlement Code for Open Access Transactions, 2006 — Second Amendment, 2014
- Dated 8 Jan 2016Interim Balancing and Settlement Code Regulation, 2006 — Third Amendment, 2016
- Dated 6 Mar 2019Interim Balancing & Settlement Code for Open Access Transactions, 2006 — Fourth Amendment Regulation, 2019
Consolidated copies, for reference (1)
Other copies of these documents (1)
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.