APERC · Andhra Pradesh Electricity Regulatory Commission

Interim Balancing and Settlement Code Regulation, 2006 — Third Amendment, 2016

AndhraPradeshElectricityRegulatoryCommission (InterimBalancing and SettlementCode) (ThirdAmendment)Regulation, 2016

AmendmentDated 8 Jan 2016Published in the Gazette 8 Jan 2016Regulation No.2 of 2016 dated JANUARY 08,2016

Amends the Interim Balancing and Settlement Code, 2006.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the third amendment to APERC's Interim Balancing and Settlement Code Regulation, 2006, issued as Regulation No. 2 of 2016 and published in the Andhra Pradesh Gazette on 8 January 2016 (p1). Its purpose is to bring the balancing and settlement code into line with the state government's Solar Power Policy, 2015 and Wind Power Policy, 2015 (G.O.Ms.No.8 dated 12-02-2015 and G.O.Ms.No.9 dated 13-02-2015), which superseded the earlier solar and wind policies (p1). The Commission acted on a request from the Government of Andhra Pradesh under section 108 of the Electricity Act, 2003, after publishing a draft on its website on 27-08-2015 and holding a public hearing on 19-12-2015 (p2–3). The preamble reproduces the two policy provisions the Commission had to give effect to — deemed energy banking and reduction of contract demand for scheduled consumers (pp2–3).

The amendment is deliberately retrospective: it is deemed to come into force from 12-02-2015 for solar projects and 13-02-2015 for wind projects commissioned during the policies' operative periods, which run to 11-02-2020 and 12-02-2020 respectively (p3).

Operatively there are two changes. Clause 2(i) inserts a new Para 8.5 entitling scheduled consumers sourcing power from the covered solar projects to a reduction in contracted demand with the DISCOM for five years from commissioning, computed from average solar consumption per hour in a billing month (p3). Clause 2(ii) substitutes Appendix-3 in full, restating the terms and conditions of the banking facility available to wind, solar and mini-hydel generators: when banking is allowed, treatment of energy injected before commercial operation date, the banking year, banking charges in kind, closed and peak-hour drawal windows, carry-forward of late-year energy, deemed purchase of unutilised banked energy by DISCOMs, advance notice of drawal schedules, and the price payable — with a proviso giving solar and wind projects within the policy periods a different (fuller) price on deemed purchase (pp4–5).

Standard name
Balancing and Settlement Code
Primary topics
Energy banking, New connections and load changes

Read with this

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.