This is UERC's Statement of Reasons for the First Amendment to the UERC (Terms and Conditions of Intra-State Open Access) Regulations, 2015 (p1). It explains how the Commission dealt with comments received on the draft amendment issued on 06.08.2016, for which comments were due 04.09.2016, and a public hearing held on 04.10.2016 (p1). It is a rationale document, not the clean amended regulation.
The Commission works through the draft regulation by regulation. It retains the definition of "Approved Capacity" because the term is used elsewhere (pp1–2), and declines to insert new definitions of "open access" and "Schedule", finding no problem in practice and existing definitions in the Act and IEGC Regulations (pp2–3). It rejects amendments to Regulation 19 on adjustment of energy (pp3–4) and to Regulation 30, except changing "imbalance charges" to "deviation charges" (pp10–11). It keeps "approved capacity" in Regulation 20 but accepts UPCL's differentiation for embedded consumers, adding a wheeling-charge formula for excess load (pp4–6).
The Commission accepts, with modifications, UPCL's alternate mechanism for computing billable maximum demand for embedded open access consumers, using the ratio of distribution licensee energy to total energy (pp7–9). It retains the 10:00 AM schedule submission deadline (p9) and shifts meter installation to the distribution licensee within one month of a complete application (pp9–10). It leaves reactive energy charges to follow intra-State ABT implementation (pp11–12).
Section 5 disposes of other stakeholder requests: cross-subsidy surcharge, green cess, RPO, continuous supply, STU charges, billing, monthly NOC, loss treatment, unutilized transmission capacity, connectivity, first-come-first-serve, system strengthening, standby charges and contract-demand reduction (pp12–20). Most are rejected, often because the amendment proceedings are limited to issues raised in the draft. The Commission does accept contract-demand revision for long/medium/short-term open access consumers through a new Regulation 28(2), with conditions including an 80% drawal floor for short-term open access (pp20–21), and directs UPCL to generate net bills after adjusting open access energy and amounts, with a mechanism to be submitted within one month (pp14–15).
Annexure-I lists stakeholders who commented (p21); Annexure-II lists public hearing participants (pp22–23). No final notification number or Gazette date is printed.
Read with this
The regulation
- Dated 13 Jan 2015Terms and Conditions of Intra-State Open Access Regulations, 2015
Amendments and corrections
- Dated 19 Dec 2016Intra-State Open Access Regulations, 2015 — First Amendment, 2016
- Dated 18 Jun 2018Intra-State Open Access Regulations, 2015 — Second Amendment, 2018
Commencement notices and reasons
2 more documents belong here and are not on Voltaic: 2 copies in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.