Skip to content

UERC · Uttarakhand Electricity Regulatory Commission

Intra-State Open Access (First Amendment) Regulations, 2016 — Statement of Reasons

Uttarakhand Electricity Regulatory Commission (Terms and Conditions of Intra-State Open Access) (First Amendment) Regulations, 2016

Statement of reasonsDate not stated

The commission's reasons for the Terms and Conditions of Intra-State Open Access Regulations, 2015 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is UERC's Statement of Reasons for the First Amendment to the UERC (Terms and Conditions of Intra-State Open Access) Regulations, 2015 (p1). It explains how the Commission dealt with comments received on the draft amendment issued on 06.08.2016, for which comments were due 04.09.2016, and a public hearing held on 04.10.2016 (p1). It is a rationale document, not the clean amended regulation.

The Commission works through the draft regulation by regulation. It retains the definition of "Approved Capacity" because the term is used elsewhere (pp1–2), and declines to insert new definitions of "open access" and "Schedule", finding no problem in practice and existing definitions in the Act and IEGC Regulations (pp2–3). It rejects amendments to Regulation 19 on adjustment of energy (pp3–4) and to Regulation 30, except changing "imbalance charges" to "deviation charges" (pp10–11). It keeps "approved capacity" in Regulation 20 but accepts UPCL's differentiation for embedded consumers, adding a wheeling-charge formula for excess load (pp4–6).

The Commission accepts, with modifications, UPCL's alternate mechanism for computing billable maximum demand for embedded open access consumers, using the ratio of distribution licensee energy to total energy (pp7–9). It retains the 10:00 AM schedule submission deadline (p9) and shifts meter installation to the distribution licensee within one month of a complete application (pp9–10). It leaves reactive energy charges to follow intra-State ABT implementation (pp11–12).

Section 5 disposes of other stakeholder requests: cross-subsidy surcharge, green cess, RPO, continuous supply, STU charges, billing, monthly NOC, loss treatment, unutilized transmission capacity, connectivity, first-come-first-serve, system strengthening, standby charges and contract-demand reduction (pp12–20). Most are rejected, often because the amendment proceedings are limited to issues raised in the draft. The Commission does accept contract-demand revision for long/medium/short-term open access consumers through a new Regulation 28(2), with conditions including an 80% drawal floor for short-term open access (pp20–21), and directs UPCL to generate net bills after adjusting open access energy and amounts, with a mechanism to be submitted within one month (pp14–15).

Annexure-I lists stakeholders who commented (p21); Annexure-II lists public hearing participants (pp22–23). No final notification number or Gazette date is printed.

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges, New connections and load changes

Read with this

Commencement notices and reasons

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document