UERC · Uttarakhand Electricity Regulatory Commission

Intra-State Open Access Regulations, 2015 — Second Amendment, 2018

Uttarakhand Electricity Regulatory Commission (Terms and Conditions of Intra-State Open Access) (Second Amendment) Regulations, 2018

AmendmentDated 18 Jun 2018In force from 1 Apr 2018No. UERC/F(9)-II/RG/UERC/2018/421 dated June 18, 2018

Amends the Terms and Conditions of Intra-State Open Access Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page amendment regulation issued by the Uttarakhand Electricity Regulatory Commission on 18 June 2018, made under section 181 read with sections 39, 40, 42 and 86 of the Electricity Act 2003, and notified after previous publication (p1). Its only operative change is a wholesale substitution of Regulation 22 (Cross subsidy surcharge) of the UERC (Terms and Conditions of Intra-State Open Access) Regulations, 2015, which it calls the Principal Regulations (p1–2).

Clause 1 gives the short title and commencement: the amendment takes effect from 01.04.2018, a date earlier than the notification itself, so it operates retrospectively for the period between that date and publication (p1).

Clause 2 re-writes Regulation 22. The new text specifies who must pay cross subsidy surcharge — any open access consumer, in addition to transmission and wheeling charges; consumers using dedicated lines even where no licensee transmission or distribution system is involved; and consumers availing open access exclusively on the inter-State transmission system — and provides that the surcharge is determined by the Commission, charged per unit each month on actual energy drawn through open access, and paid to the distribution licensee (p1–2). It sets three provisos: no surcharge on energy drawn during a power cut imposed by the distribution licensee; no surcharge on a person who has established a captive generating plant for carriage to his own use; and the Commission may review the surcharge where the power supply position or the consumer's load changes substantially. It closes by giving the formula for determining the surcharge, expressed as a subtraction of average cost of supply from the applicable retail tariff (p2).

There is no savings clause, no transitional provision and no annexure or schedule; the Commission's Secretary signs by order of the Commission (p2).

Standard name
Open Access Regulations
Primary topics
Open access charges

Read with this

Amendments and corrections

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document