UERC · Uttarakhand Electricity Regulatory Commission
Intra-State Open Access Regulations, 2015 — Second Amendment, 2018
Uttarakhand Electricity Regulatory Commission (Terms and Conditions of Intra-State Open Access) (Second Amendment) Regulations, 2018
AmendmentDated 18 Jun 2018In force from 1 Apr 2018No. UERC/F(9)-II/RG/UERC/2018/421 dated June 18, 2018
Amends the Terms and Conditions of Intra-State Open Access Regulations, 2015.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a two-page amendment regulation issued by the Uttarakhand Electricity Regulatory Commission on 18 June 2018, made under section 181 read with sections 39, 40, 42 and 86 of the Electricity Act 2003, and notified after previous publication (p1). Its only operative change is a wholesale substitution of Regulation 22 (Cross subsidy surcharge) of the UERC (Terms and Conditions of Intra-State Open Access) Regulations, 2015, which it calls the Principal Regulations (p1–2).
Clause 1 gives the short title and commencement: the amendment takes effect from 01.04.2018, a date earlier than the notification itself, so it operates retrospectively for the period between that date and publication (p1).
Clause 2 re-writes Regulation 22. The new text specifies who must pay cross subsidy surcharge — any open access consumer, in addition to transmission and wheeling charges; consumers using dedicated lines even where no licensee transmission or distribution system is involved; and consumers availing open access exclusively on the inter-State transmission system — and provides that the surcharge is determined by the Commission, charged per unit each month on actual energy drawn through open access, and paid to the distribution licensee (p1–2). It sets three provisos: no surcharge on energy drawn during a power cut imposed by the distribution licensee; no surcharge on a person who has established a captive generating plant for carriage to his own use; and the Commission may review the surcharge where the power supply position or the consumer's load changes substantially. It closes by giving the formula for determining the surcharge, expressed as a subtraction of average cost of supply from the applicable retail tariff (p2).
There is no savings clause, no transitional provision and no annexure or schedule; the Commission's Secretary signs by order of the Commission (p2).
Read with this
The regulation
- Dated 13 Jan 2015Terms and Conditions of Intra-State Open Access Regulations, 2015
Amendments and corrections
- Dated 19 Dec 2016Intra-State Open Access Regulations, 2015 — First Amendment, 2016
Commencement notices and reasons
2 more documents belong here and are not on Voltaic: 2 copies in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.