UERC · Uttarakhand Electricity Regulatory Commission

Intra-State Open Access Regulations, 2015 — First Amendment, 2016

Uttarakhand Electricity Regulatory Commission (Terms and Conditions of Intra-State Open Access) (First Amendment) Regulations, 2016

AmendmentDated 19 Dec 2016Published in the Gazette 24 Dec 2016No. UERC/F(9)-I/RG/UERC/2016/1424 dated December 19, 2016

Amends the Terms and Conditions of Intra-State Open Access Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Uttarakhand Electricity Regulatory Commission's First Amendment to its 2015 Intra-State Open Access Regulations, notified on 19 December 2016 and effective from the date of that notification (p1). It makes eight targeted changes and does not restate the Principal Regulations, so it must be read alongside the 2015 instrument.

Clause 2 rewrites the wheeling-charge proviso in Regulation 20(2), splitting the treatment of embedded open access consumers between open access within contracted load and open access beyond contracted load, each with its own wheeling-charge formula (p1–2). Clause 3 is the largest part: it inserts six new sub-regulations into Regulation 26, requiring open access customers to comply with the Indian Electricity Grid Code, the State Grid Code, SLDC/STU instructions and the CEA Connectivity Regulations, 2007; imposing per-time-block scheduling against contracted load; permitting long-, medium- and short-term open access above contracted load up to sanctioned open access capacity; and prescribing how fixed/demand charges are levied on embedded consumers, including a pro-rata maximum-demand computation. It also adds a daily 10:00 AM schedule submission and outage-intimation and restoration-notice rules (p2–3).

Clause 4 fixes a one-month deadline for the distribution licensee to install meters from submission of a complete open access application (p3). Clause 5 retitles Regulation 28 and routes revision of contract demand to the 2008 HT/EHT Connections Regulations, bars short-term open access consumers from revising contract demand during the tenure, and sets a floor on drawal during open access periods relative to non-open-access drawal (p3–4).

Clauses 6 to 8 rename Chapter 7 as "Deviation Settlement", replace "imbalance charges" with "deviation charges" throughout Regulation 30, insert a maximum-demand cross-reference, and make the deviation-charge regime expressly interim pending operation of intra-State ABT, after which deviation and reactive-energy charges are to be settled through SLDC-prepared accounts under the State Grid Code and future Commission regulations (p4–5).

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges, Scheduling and despatch

Read with this

Amendments and corrections

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document