UERC · Uttarakhand Electricity Regulatory Commission
Terms and Conditions of Intra-State Open Access Regulations, 2015
Uttarakhand Electricity Regulatory Commission (Terms and Conditions of Intra-State Open Access) Regulations, 2015
RegulationDated 13 Jan 2015No. UERC/F(9)RG/UERC/2015/1883 dated January 13, 2015
2 amendments to it are on Voltaic, the latest dated 18 Jun 2018.
Summary
Summary written by software, from pages 1 to 23 of 36. Check the regulator's original before you rely on it.
This notification, dated 13 January 2015, makes the Uttarakhand Electricity Regulatory Commission (Terms and Conditions of Intra-State Open Access) Regulations, 2015, which on publication replace the Commission's 2010 intra-state open access regulations (p1). It applies to open access customers using the State's intra-state transmission and distribution systems, including where that use is combined with the inter-state system (p1).
Chapter 1 (p1–3) gives the title, the commencement-and-replacement clause, the scope and 26 definitions — including approved capacity, embedded open access consumer, imbalance, stranded transmission/distribution capacity, force majeure, and the three access durations (long-term, medium-term and short-term).
Chapter 2 (p4–6) deals with connectivity: eligibility for connection, the application route and fee to STU/PTCUL for the transmission system and to the distribution licensee/UPCL for the distribution system, the 30-day processing deadline, connection agreements, who bears the cost of interconnection facilities, and permission to inject infirm power for testing before commercial operation.
Chapter 3 (p7) sets the general open access provisions — who is eligible (licensees, generating companies, captive plants, consumers), the consumer eligibility threshold, and the criteria for granting long-term access as against medium- or short-term access, including the bar on network augmentation solely for medium/short-term access.
Chapter 4 (p8–18) is the procedural core: the table assigning nodal agency, application fee, accompanying documents and disposal timelines by access type; the detailed long-term, medium-term and short-term procedures (short-term covering advance application, electronic bidding on congestion, day-ahead and contingency routes); consent by STU/SLDC with deemed-consent timelines; summary rejection of defaulter applications; and allotment priority, headed by the distribution licensee.
Chapter 5 (p19–21, mis-numbered in the text as Chapter 3) covers open access charges: settlement of energy for embedded consumers; the transmission and wheeling charge formulae and part-day charging; SLDC and system operation charges; cross-subsidy surcharge; additional surcharge; standby charges; and other charges.
Chapter 6 (p22) covers scheduling by SLDC, ABT-compliant main and check metering, schedule revision and payment of transmission/distribution losses in kind. Chapter 7 (p23) sets imbalance charges by reference to tariff-order rates and average power purchase cost.
Read with this
Amendments and corrections
- Dated 19 Dec 2016Intra-State Open Access Regulations, 2015 — First Amendment, 2016
- Dated 18 Jun 2018Intra-State Open Access Regulations, 2015 — Second Amendment, 2018
Commencement notices and reasons
2 more documents belong here and are not on Voltaic: 2 copies in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of UERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.