Deviation Settlement Mechanism and Related Matters Amendment Regulations, 2024 (amending the 2019 Regulations) — Draft

Tamil Nadu Electricity Regulatory Commission (Deviation settlement mechanism and related matters) Amendment Regulations, 2024

Draft amendmentDated 1 Oct 2024TNERC/DSM&RM/22-…… dated 01-10-2024

Draft

A proposal that has since been finalised as the Deviation Settlement Mechanism and Related Matters (Amendment) Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a TNERC draft amendment, put out on the Commission's website on 1 October 2024 with comments due by 1 November 2024 (p1), to the 2019 Deviation Settlement Mechanism and Related Matters Regulations. If finalised, it is to take effect from 1 April 2024 — a backdated commencement the draft ties to two earlier Commission orders (p2).

Regulations 4 and 7 (pp2–3) redraw coverage and measurement. DSM applies to all sellers, including open access and State-owned generating stations, but not wind, solar or State-owned hydro including run-of-river; buyers are distribution licensees, deemed licensees and full open access consumers, with other open access consumers to be brought in on a later date the Commission notifies. The frequency operating range is tied to the IEGC with a working band of 49.90–50.05 Hz, State Deviation Pool Accounts move to weekly preparation and publication by SLDC, and losses for scheduling follow the Commission's tariff orders, with SLDC publishing actual intra-State transmission losses each time block.

Regulations 9 to 11 (pp3–6) are the enforcement core: penal charges for gaming; a requirement that an entity change the sign of its deviation at least once every six time blocks, with a 20% additional charge from the seventh block; zero deviation charges for infirm power injected before COD; daily deviation volume limits for drawees and generators with an additional charge; hard prohibitions on over-drawal when frequency is below 49.90 Hz and on under-drawal at 50.05 Hz and above; and replacement of the additional-charge clauses so that rates follow Table I of Annexure II and, below 49.90 Hz, equal 100% of the deviation charge. Clause (T) has SLDC publish weekly deviation records. Regulation 13 requires State entities to comply with statutory levies (p6).

Regulations 8–10 (pp6–7) tidy the annexures: one sub-clause removed from Annexure I, Table II of Annexure II removed, and the price definition in Annexure III rewritten as a weighted-average day-ahead clearing price across all power exchanges.

The Explanatory Statement (pp8–11) gives the reasoning: removing the cap rates in Regulation 10(A)(2) and (3) — 311 paise/unit and 303.04 paise/unit — which left the DISCOM bearing the gap between CERC regional pool rates and what generators paid; tightening the treatment of gaming; and excluding irrigation-linked State hydro used as spinning reserve. The Commission also signals a later review to align with the CERC DSM Regulations, 2024 (p11).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Scheduling and despatch, Energy accounting and settlement

Read with this

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗