Deviation Settlement Mechanism and Related Matters (Amendment) Regulations, 2024
Tamil Nadu Electricity Regulatory Commission (Deviation settlement mechanism and related matters) (Amendment) Regulations, 2024
AmendmentDated 27 Dec 2024Published in the Gazette 22 Jan 2025Notification No. TNERC/DSM&RM/22-3 dated 27-12-2024
Amends the Deviation Settlement Mechanism and Related Matters Regulations, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is TNERC's 2024 amendment tightening the State's intra-state Deviation Settlement Mechanism. Issued as Notification No. TNERC/DSM&RM/22-3 dated 27-12-2024 and published in the Tamil Nadu Government Gazette on 22-01-2025 (p1–2), it substitutes and omits provisions of the TNERC (Deviation Settlement Mechanism and related matters) Regulations, 2019 rather than replacing them. It takes effect from gazette publication except the removal of the cap rate, which is deemed effective from 01-04-2024 (p2).
The operative text (pp2–7) rewrites applicability so DSM covers all open-access buyers and sellers using the intra-state transmission and distribution system, including inter-state wheeling, while excluding wind, solar and State-owned hydro generating stations including run-of-river projects (p2). It renumbers an energy-accounting sub-regulation, ties the normal frequency operating range to the Indian Electricity Grid Code, makes State Deviation Pool Accounts a weekly SLDC publication, and restates how transmission and distribution losses enter scheduling (p3). Rules on gaming are replaced, with a new power for SLDC to require a generator to demonstrate declared capability (p3). Regulation 10 is rewritten — the price-vector basis of deviation charges, a six-time-block sign-change obligation, and, by omission, the end of the capped rates (p3). Regulation 11 is heavily revised: volume limits, frequency thresholds below which over-drawal and above which under-drawal are disallowed, and the additional-charge methodology (pp3–5). Accounting and payment rules change, including simple interest on delayed payment (p5). Annexures I and III are replaced with new price-vector tables and Annexure II Table-II omitted (pp5–6).
The Explanatory Statement (pp7–8) records the rationale — rising RE penetration, the TANGEDCO petition, the CERC ACP ceiling revision and the hydro exemption — and the comparison statement at pp9–18 shows each existing and amended provision side by side.
Read with this
The regulation
Earlier drafts
2 more documents belong here and are not on Voltaic: 2 copies in another language.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.