Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Deviation Settlement Mechanism and Related Matters Regulations, 2019

Tamil Nadu Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulations, 2019

RegulationDated 1 Mar 2019Published in the Gazette 20 Mar 2019TNERC/DSM&RM/22-1 dated 01-03-2019

1 amendment to it is on Voltaic, dated 27 Dec 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The TNERC (Deviation Settlement Mechanism and related matters) Regulations, 2019, notified as TNERC/DSM&RM/22-1 dated 01-03-2019 and published in the Tamil Nadu Government Gazette on 20 March 2019 (p1–2), establish the intra-State deviation settlement framework for grid users. They are made under ss.86(1) and 181(2)(zp) read with ss.32–33 of the Electricity Act 2003 (p2). Most provisions come into force on Gazette publication, while commercial arrangements, deviation charges, additional charges and penal actions take effect six months later (p2–3).

Regulations 1–4 set commencement, definitions, objective and applicability. The framework applies to transactions using short-, medium- or long-term open access over the intra-State transmission or distribution system, including inter-State wheeling, and binds sellers (including open-access generating stations and distribution licensees' stations) and buyers, but expressly excludes wind and solar generating stations, and excludes full and partial open-access consumers from certain deviation settlement provisions (p3–4).

Regulations 5–9 deal with SLDC duties, energy accounting statements, the design parameters for operationalising DSM (scheduling periods, frequency range, deviation definition, settlement period, units, price vector, volume limits and loss allocation), declaration and scheduling, and gaming. SLDC prepares monthly energy accounting and weekly deviation statements; the Commission may initiate gaming proceedings and disallow deviation charges (p4–6).

Regulations 10–11 are the commercial core: deviation charges are linked to the CERC DSM 2014 price vector and grid frequency, with cap rates, zero-charge bands, and market-linked reference at specified frequency; they also set volume limits and additional deviation charges for over-drawal/under-injection, with sign-change requirements and treatment of pre-COD infirm power (p6–9).

Regulations 12–19 cover compliance with SLDC instructions, accounting and operation of the State Deviation Pool Account, payment timelines and interest, letter of credit security, formation and functions of the State Power Committee, and the Commission's powers to amend, remove difficulties, relax and issue directions (p9–12).

Annexures I–III provide the DSM price-vector table and notes, additional deviation charge tables for buyers/sellers and for coal/lignite/APM-gas stations, and an illustration of the price vector (p12–15).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Energy accounting and settlement, Open access

Read with this

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of TNERC's website on 29 Sep 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document