TNERC · Tamil Nadu Electricity Regulatory Commission
Draft Amendment to the Deviation Settlement Mechanism and Related Matters Regulations, 2019 — commencement of commercial arrangements
Draft of the amendment to the TNERC (Deviation Settlement Mechanism and Related Matters) Regulations 2019
Draft amendmentDated 18 Nov 2019Draft Notification No.TNERC/DSM/22-2 dated dt. .11.2019
Draft
A proposal that has since been finalised as the Deviation Settlement Mechanism and Related Matters (Amendment) Regulations, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is a TNERC draft amendment, published for comment, to the Tamil Nadu Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2019 (p1). Its operative change is narrow: it would substitute the proviso to Regulation 1(2) so that the provisions on Commercial Arrangements, Deviation Charges, the Additional Charge for Deviation and penal actions come into force on a date the Commission notifies, rather than by a fixed clock (p1–2). A side-by-side statement sets out the existing and proposed provisos (p4).
The explanatory statement says the existing six-month trigger had already arrived on 21.9.2019. Stakeholders asked for more time to trial the commercial mechanism after installing hardware and software, and the State Load Despatch Centre, TANTRANSCO asked for an extension to complete the pilot run of software modules and equipment installation (p3). The proposal is therefore an enabling provision: it does not itself set the new date or change the charge methodology (p2–3).
The notice invites objections or suggestions within fifteen days of publication on the TNERC website, with a printed deadline of 03.12.2019 (p1). The draft will be considered after that period (p1).
Read with this
The regulation
Amendments and corrections
Earlier drafts
2 more documents belong here and are not on Voltaic: 2 copies in another language.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.