Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Commission's Statement of Reasons accompanying the Telangana State Electricity Regulatory Commission (Smart Grid) Regulation, 2021, issued under the Electricity Act, 2003 and dated 30.06.2021 (p1). It is not the Regulation itself: it sets out why the Commission framed the Regulation and records, clause by clause, what stakeholders said and how the Commission disposed of each comment. The operative Regulation text is quoted within each discussion rather than printed as an annexure.
The Preamble (p1–2) explains the Commission's rationale — smart grid as a 'system of systems' built on automation, communication and IT, needed to integrate intermittent renewables, support demand response, energy storage and future electric-vehicle load, and to address cyber security of devices sitting outside conventional regulated boundaries. It also recounts the consultation history: a 2016 draft (15.11.2016) that drew two stakeholders, and a fresh draft posted on the Commission's website on 24.11.2020 under the Electricity (Previous Publication) Rules, 2005, with comments due by 16.12.2020, which drew four stakeholders (p2).
The bulk of the document (p2–18) walks through the draft clauses in order — definitions, the list of smart grid processes, constitution of a Smart Grid Cell, baseline study, formulation and approval of multi-year smart grid plans, execution and standards, cost-recovery mechanism, completion reporting, monitoring and verification, awareness and capacity building, and safety/standards including consumer data protection. Each section shows the Commission's proposal, the submissions of named stakeholders (TSSPDCL, NPMU/NPSM, Centre for Energy Regulation, M/s Customised Energy Solutions, and Sri M.Venugopala Rao) and the Commission's view; in every instance the Commission decided to retain the clause as proposed.
The closing section 'Others' (p15–18) records the Commission's rejection of a request to first issue a working paper or pilot the scheme, and describes the Commission's 27.01.2021 field visit to TSSPDCL's Jeedimetla/Shapurnagar pilot — its AMI, outage management, power-quality and peak-load management scope, and the Chairman's remarks on decarbonisation. The Annexure (p19) lists the stakeholders who submitted written comments on the earlier and current drafts.
Read with this
The regulation
- Dated 28 Jun 2021Smart Grid Regulation, 2021
Earlier drafts
- Released with the notice dated 15 Nov 2016Smart Grid Regulations, 2016
- Dated 15 Nov 2016File: Telangana Smart Grid Regulations, 2016 — Draft — Press Release
- Dated 24 Nov 2020Smart Grid Regulation, 2020 — Consultation Notice — Draft
- Dated 24 Nov 2020File: Smart Grid Regulation, 2020 — Draft
Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.