TSERC · Telangana State Electricity Regulatory Commission
Smart Grid Regulation, 2021
Telangana State Electricity Regulatory Commission (Smart Grid) Regulation, 2021
RegulationDated 28 Jun 2021Published in the Gazette 2 Jul 2021No. TSERC/4/2021 dated 28-06-2021
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Telangana State Electricity Regulatory Commission (Smart Grid) Regulation, 2021 — Regulation No. 4 of 2021, published in the Telangana Gazette Extraordinary on 2 July 2021 — is the Commission's framework for how utilities plan, obtain approval for, build, recover costs on and report on smart grid investments in the state (p1, p3).
The preamble (pp1–2) sets out the Commission's reasoning: smart grids as a "system of systems" needing standardised communication and interoperability, smart meters as the entry point to Advanced Metering Infrastructure, wide-area situational awareness, demand response, storage, and rising electric-vehicle load. It records the policy backdrop (GoI Smart Grid Vision and Roadmap; National Smart Grid Mission under the Ministry of Power), the 2016 draft and the re-issued 2020 draft that went through fresh stakeholder consultation, and cites s.181(2)(zp) of the Electricity Act, 2003 as the enabling power (p2).
Clauses 1–3 make the regulation applicable to all generating companies, transmission and distribution licensees (including deemed licensees and those exempt from licensing) and consumers connected to the Telangana grid; bring it into force on Gazette publication; define AMI, aggregator, prosumer, microgrid, distributed generation, electric energy storage, interoperability, KPI, WAMS, cyber security and smart meter (by IS 16444); and state the regulation's objectives (pp3–4).
The operative middle is procedural: the activities constituting the "Smart Grid process" (clause 4); a Smart Grid Cell mandated in every transmission and distribution licensee (clause 5); baseline study and database building (clause 6); and an integrated Multi-Year Smart Grid Plan filed with the MYT/ARR petition, with a project-investment threshold above which prior Commission approval is needed (clause 7, pp5–7). Clause 8 governs approval and lets the Commission fix cost-recovery methodology and incentive/dis-incentive mechanisms.
The remainder covers execution, standards and accountability: a standards hierarchy of CEA, then BIS, then IEC/IEEE/ANSI (clauses 9 and 14), cost recovery through ARR subject to prudence check (clause 10), a completion report within a month of project completion to be posted on the utility's website (clause 11), KPI-based monitoring and verification (clause 12), an earmark of project cost for consumer awareness and capacity building (clause 13), and consumer-data protection, testing and certification requirements (clause 14, pp9–10). Clauses 15–20 give the Commission powers to amend, direct, relax, remove difficulties, depart from its own procedure, and conduct enquiries through its Conduct of Business Regulations (p10).
Read with this
Commencement notices and reasons
- Dated 30 Jun 2021Smart Grid Regulation, 2021 — Statement of Reasons
Earlier drafts
- Released with the notice dated 15 Nov 2016Smart Grid Regulations, 2016
- Dated 15 Nov 2016File: Telangana Smart Grid Regulations, 2016 — Draft — Press Release
- Dated 24 Nov 2020Smart Grid Regulation, 2020 — Consultation Notice — Draft
- Dated 24 Nov 2020File: Smart Grid Regulation, 2020 — Draft
Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of TSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.