Smart Grid Regulation, 2020 — Draft

Telangana State Electricity Regulatory Commission (Smart Grid) Regulation, 2020

Published with a draftDated 24 Nov 2020No.TSERC/__/2020 dated 24.11.2020

Draft

The draft has since been finalised as the Smart Grid Regulation, 2021.

Published with the Smart Grid Regulation, 2020 — Consultation Notice — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tgerc.telangana.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Telangana State Electricity Regulatory Commission issued this draft on 24 November 2020 for a second round of stakeholder consultation on a Smart Grid regulation, after an earlier draft of 15 November 2016 (p1). It is made under s.181(2)(zp) of the Electricity Act 2003 and would apply to all generating companies, transmission and distribution licensees (including deemed licensees and those exempt from licensing) and consumers in Telangana connected to the state grid, coming into force on Gazette publication (p1–2).

Clauses 2–4 set the vocabulary (AMI and smart meters, aggregators, distributed generation, storage, microgrids, prosumers, WAMS, cyber security) and the objectives: integrating smart grid technologies, improving network visibility and asset utilisation, integrating renewable and clean energy and micro-grids, and raising consumer service levels (p2–3).

The operative obligations fall on licensees. Each must constitute a Smart Grid Cell within three months (cl.5, p4), carry out a baseline study and build a database (cl.6, p4), and submit an integrated multi-year Smart Grid Plan alongside its MYT or ARR petition; individual projects above a Rs.20 crore investment threshold need prior Commission approval, while smaller investments do not if they sit inside an approved plan (cl.7, p5). Clause 7 also lists indicative project components — AMI, demand response, microgrids, distribution SCADA, distributed generation, peak load and outage management, WAMS, storage, renewables integration, EV/G2V/V2G, data analytics and dynamic tariffs — and creates R&D funding provisions within ARR for distribution licensees and separately for the transmission licensee and SLDC (p5).

Clauses 8–14 cover approval (with expert assistance and incentive/dis-incentive mechanisms), cost recovery through ARR subject to prudence check, execution against a CEA–BIS–IEC/IEEE/ANSI standards hierarchy, a completion report within a month, KPI-based monitoring and verification, an earmark of project cost for consumer awareness and capacity building, and standards for system, network, product, performance, consumer data protection and testing/certification (p6–8).

Clauses 15–20 are the machinery provisions — amendment, directions, relaxation, removal of difficulties, savings, and enquiry/investigation/adjudication through the Conduct of Business Regulations (p9).

Standard name
Smart Grid Regulations
Primary topics
Smart grid, Capital cost and investment, ARR and true-up

Read with this

The regulation

Commencement notices and reasons

Earlier drafts

Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tgerc.telangana.gov.in ↗

Report an issue with this document