TSERC · Telangana State Electricity Regulatory Commission
Smart Grid Regulation, 2020 — Draft
Telangana State Electricity Regulatory Commission (Smart Grid) Regulation, 2020
Published with a draftDated 24 Nov 2020No.TSERC/__/2020 dated 24.11.2020
Draft
The draft has since been finalised as the Smart Grid Regulation, 2021.
Published with the Smart Grid Regulation, 2020 — Consultation Notice — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Telangana State Electricity Regulatory Commission issued this draft on 24 November 2020 for a second round of stakeholder consultation on a Smart Grid regulation, after an earlier draft of 15 November 2016 (p1). It is made under s.181(2)(zp) of the Electricity Act 2003 and would apply to all generating companies, transmission and distribution licensees (including deemed licensees and those exempt from licensing) and consumers in Telangana connected to the state grid, coming into force on Gazette publication (p1–2).
Clauses 2–4 set the vocabulary (AMI and smart meters, aggregators, distributed generation, storage, microgrids, prosumers, WAMS, cyber security) and the objectives: integrating smart grid technologies, improving network visibility and asset utilisation, integrating renewable and clean energy and micro-grids, and raising consumer service levels (p2–3).
The operative obligations fall on licensees. Each must constitute a Smart Grid Cell within three months (cl.5, p4), carry out a baseline study and build a database (cl.6, p4), and submit an integrated multi-year Smart Grid Plan alongside its MYT or ARR petition; individual projects above a Rs.20 crore investment threshold need prior Commission approval, while smaller investments do not if they sit inside an approved plan (cl.7, p5). Clause 7 also lists indicative project components — AMI, demand response, microgrids, distribution SCADA, distributed generation, peak load and outage management, WAMS, storage, renewables integration, EV/G2V/V2G, data analytics and dynamic tariffs — and creates R&D funding provisions within ARR for distribution licensees and separately for the transmission licensee and SLDC (p5).
Clauses 8–14 cover approval (with expert assistance and incentive/dis-incentive mechanisms), cost recovery through ARR subject to prudence check, execution against a CEA–BIS–IEC/IEEE/ANSI standards hierarchy, a completion report within a month, KPI-based monitoring and verification, an earmark of project cost for consumer awareness and capacity building, and standards for system, network, product, performance, consumer data protection and testing/certification (p6–8).
Clauses 15–20 are the machinery provisions — amendment, directions, relaxation, removal of difficulties, savings, and enquiry/investigation/adjudication through the Conduct of Business Regulations (p9).
Read with this
The regulation
- Dated 28 Jun 2021Smart Grid Regulation, 2021
Commencement notices and reasons
- Dated 30 Jun 2021Smart Grid Regulation, 2021 — Statement of Reasons
Earlier drafts
- Released with the notice dated 15 Nov 2016Smart Grid Regulations, 2016
- Dated 15 Nov 2016File: Telangana Smart Grid Regulations, 2016 — Draft — Press Release
- Dated 24 Nov 2020Smart Grid Regulation, 2020 — Consultation Notice — Draft
Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.