Skip to content

TSERC · Telangana State Electricity Regulatory Commission

Smart Grid Regulation, 2020 — Consultation Notice — Draft

In the matter of Telangana State Electricity Regulatory Commission (Smart Grid) Regulation, 2020

Draft regulationDated 24 Nov 2020

Draft

A proposal that has since been finalised as the Smart Grid Regulation, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tgerc.telangana.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is TSERC's public consultation notice for the draft Telangana State Electricity Regulatory Commission (Smart Grid) Regulation, 2020, issued from Hyderabad on 24.11.2020 by the Commission Secretary [FAC] (p1–2). The first paragraphs explain why the Commission is acting: the electricity sector must keep pace with IT and engineered services, and a smart grid — an automated grid with communication and IT systems that monitors and controls power flows from generation down to appliance level — brings visibility, flexibility, better integration of intermittent renewable generation and lower peak-power costs (p1). It records that the Government of India has notified a Smart Grid Vision and Roadmap and that the Ministry of Power has set up the National Smart Grid Mission (p1).

The notice recalls that TSERC issued an earlier draft Smart Grid Regulation on 15.11.2016, received comments from only two stakeholders, and has therefore decided to re-issue the draft for consultation before finalising it (p1). It states that the draft is made under s.181(2)(zp) of the Electricity Act, 2003 and is hosted on the Commission's website (p1–2).

All interested persons and stakeholders are invited to send comments, in writing to the Secretary, TSERC or by email, before 5.00 P.M. on 16.12.2020 (p2). No final regulation, commencement date or gazette reference is stated.

Standard name
Smart Grid Regulations
Primary topics
Smart grid

Read with this

The regulation

Commencement notices and reasons

Earlier drafts

Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tgerc.telangana.gov.in ↗

Report an issue with this document