Forecasting, Scheduling and Deviation Settlement for Solar and Wind Regulations, 2019 — Relaxation Order, 2020

Relaxation in certain provisions of the PSERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Resources) Regulations, 2019

OrderDated 11 Feb 2020Published in the Gazette 7 Jan 2019

Made under the Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources Regulations, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page PSERC order dated 11.02.2020 that defers, for a second time, the commencement of forecasting and scheduling obligations under the PSERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Resources) Regulations, 2019 (p1–2).

The 2019 Regulations were notified and gazetted on 7 January 2019, and the proviso to regulation 1.3 provided that forecasting and scheduling would commence six months from notification. A Commission order of 23.09.2019 relaxed that proviso so that it would commence on 01.01.2020 (p1).

PSTCL/SLDC then reported that scheduling cannot be implemented manually across a large number of RE generators, because the manpower, software and hardware required fall under the SAMAST scheme, which is still at tender stage and may take six to eight months from tender opening (p1). Accepting that difficulty, the Commission uses Regulations 11 and 12 of the 2019 Regulations to relax the proviso to regulation 1.3 so that forecasting and scheduling commence 01.01.2021 (p2). No other provision of the Regulations is altered. The order is signed by the Chairperson and a Member at Chandigarh (p2).

Standard name
Forecasting, Scheduling and DSM for Wind and Solar
Primary topics
Scheduling and despatch

Read with this

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document